Public Records Index — Phase 1 (Preliminary)
Philsouth Projects in Negros Oriental: Public Records Index
This page organizes publicly available records and source references related to Philsouth-linked infrastructure and procurement projects in Negros Oriental. It is intended as a research index for journalists, public-interest researchers, legal teams, agencies, students, and citizens looking for one central place to review available project records.
About This Index
The Philsouth Projects in Negros Oriental Public Records Index collects source-linked references to infrastructure and procurement records connected to Philsouth-related entities, joint ventures, and public project references in Negros Oriental.
The index covers available public records from the Provincial Government of Negros Oriental, city and municipal sources, DPWH/GPPB performance references, public procurement postings, source ledgers, and other publicly accessible materials. Records are classified by source strength so readers can distinguish official award records from performance references, procurement leads, company portfolio claims, and items needing further verification.
This index does not make legal conclusions, determine procurement compliance, or accuse any person or entity of wrongdoing.
Verification status legend
- A Verified official award or contract record
NOA, contract, BAC resolution, or PhilGEPS award notice located on an official government source. An official LGU social-media post or press release also qualifies as Tier A only when the post itself includes or links to the NOA / NTP / contract agreement / BAC resolution / PhilGEPS award notice.
- B Official procurement / planning / financing lead
Invitation to Bid, BAC bulletin, AIP/APP entry, council approval, loan approval, project authorization, SB/SP resolution, or an official LGU social-media post / press release that confirms council approval, financing, project authorization, or signing/launching ceremony — but does not include the award/contract document itself.
- C Official performance, transparency, project-status, or public-agency reference
GPPB/PCAB CPES, COA, BetterGov DPWH transparency mirror, Sumbong sa Pangulo, or an official LGU social-media post / press release / PIO release that confirms project existence, location, contractor participation, groundbreaking, implementation, completion, inspection, or turnover. Establishes that the project exists and that the contractor is named in an official narrative; the underlying procurement file (NOA / contract / amount) is still required for full source review.
- D Company portfolio or unofficial media / private lead
Source is a company portfolio page, private Facebook post, unofficial page, ordinary media report, YouTube content, Scribd upload, citizen post, or non-government commentary. Listed as a lead only — not treated as proof of award and not the same as an official LGU page.
- E Needs manual verification
Search-indexed reference whose underlying official document was not retrievable in this pass (e.g., portal blocked by anti-bot challenge), screenshots are incomplete, links are dead, OCR is unclear, or the official status of the page cannot be confirmed. Manual retrieval or an official record request is needed.
About Tier C: Tier C records come from official performance, audit, or project-reference sources such as CPES or similar government records. These confirm that a project or contractor reference appears in an official performance or monitoring record, but they are not the same as a Notice of Award, contract agreement, or Notice to Proceed unless those documents are also located.
Coverage: Provincial Government plus 25 LGUs
No public web record located yet in this index. This does not mean no project exists; it means no source-backed record has been added to this public index as of the latest update.
No public web record located yet in this index. This does not mean no project exists; it means no source-backed record has been added to this public index as of the latest update.
No public web record located yet in this index. This does not mean no project exists; it means no source-backed record has been added to this public index as of the latest update.
No public web record located yet in this index. This does not mean no project exists; it means no source-backed record has been added to this public index as of the latest update.
Largest located official-source records
Sorted by amount. All amounts come from the source URL listed in the row.
| Project | Entity | Year | Amount (PHP) | Contractor | Source |
|---|---|---|---|---|---|
| Design & Build for the Construction of the Negros Oriental Medical City, Dumaguete City, Negros Oriental | Provincial Government of Negros Oriental | 2024 | 3,299,899,999.92 | PHILSOUTH BUILDERS INC. / TERP ASIA CONSTRUCTION CORP., JV | View |
| Design and Build: Construction of New Negros Oriental Government Center, Dumaguete City, Negros Oriental | Provincial Government of Negros Oriental | 2024 | 1,459,488,828.51 | PHILSOUTH BUILDERS, INC. | View |
| Design and Build: Construction/Improvement of Bayawan District Hospital | Provincial Government of Negros Oriental | 2025 | 99,899,665.33 | PHILSOUTH BUILDERS, INC. | View |
| Design and Build: Construction/Improvement of Bais District Hospital | Provincial Government of Negros Oriental | 2025 | 99,899,597.38 | PHILSOUTH BUILDERS, INC. | View |
| Design and Build: Construction/Improvement of Governor William 'Billy' Villegas Memorial Hospital | Provincial Government of Negros Oriental | 2025 | 99,899,502.77 | PHILSOUTH BUILDERS, INC. | View |
| Construction of Cabanlutan Bridge, Bais City, Negros Oriental | Provincial Government of Negros Oriental | 2025 | 79,537,467.42 | PHILSOUTH BUILDERS INC. AND BIGFOOT CONSTRUCTION & SUPPLY - JOINT VENTURE | View |
| Design and Build: Construction of Bridge - Reinforced Concrete Deck Girder (RCDG), Novallas, Tanjay City, Negros Oriental | Provincial Government of Negros Oriental | 2023 | 74,997,689.24 | PHILSOUTH BUILDERS INC. AND BIGFOOT CONSTRUCTION & SUPPLY (JOINT VENTURE) | View |
| Improvement of School Facilities for Public Schools under DepEd, Negros Oriental Division | Provincial Government of Negros Oriental | 2024 | 58,795,000.00 | PHILSOUTH BUILDERS INC. | View |
| Supply of 2,212 cu.m Concrete Mix using Pumpcrete (3,000 psi) for Construction of Shoreline Protection from Pantawan 1 Going South to Pantawan 2 at Barangay Poblacion 4 | City Government of Dumaguete | 2024 | 12,719,000.00 | PHIL SOUTH BUILDERS INC | View |
| One (1) Lot Purchase and Installation of Solar Back-up Power Supply for use in the DRRM-CCA Satellite Response and Emergency Operations Center for 13 Health Facilities, PDRRMC, PGO, Province of Negros Oriental | Provincial Government of Negros Oriental | 2024 | 11,494,200.00 | PHILSOUTH BUILDERS INC. | View |
Search and filter the full registry
321 of 321 records shown.
| # | Status | Project | Entity / Location | Year | Amount (PHP) | Contractor / JV | Source type | Source link |
|---|---|---|---|---|---|---|---|---|
| REG-007 | A | Design & Build for the Construction of the Negros Oriental Medical City, Dumaguete City, Negros Oriental | Dumaguete City Provincial Government of Negros Oriental | 2024 | 3,299,899,999.92 | PHILSOUTH BUILDERS INC. / TERP ASIA CONSTRUCTION CORP., JV | Official LGU NOA page | View |
| REG-004 | A | Design and Build: Construction of New Negros Oriental Government Center, Dumaguete City, Negros Oriental | Dumaguete City Provincial Government of Negros Oriental | 2024 | 1,459,488,828.51 | PHILSOUTH BUILDERS, INC. | Official LGU NOA page | View |
| REG-022 | C | CSSP MVUC: Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads along Bais-Kabankalan Road (multiple K-stations K0070+000 to K0100+666) Research notesDPWH project ID 24H00022, License 21962, status On-going, CPES visit/final 90.90%/. | Kabankalan (NegOcc — DPWH route) DPWH | 2024 | 253,025,337.00 | PHILSOUTH BUILDERS INC. (Formerly: Lotiff Construction) | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| BGov-16R00100 | C | IMPROVEMENT/WIDENING OF DUMAGUETE SOUTH RD INCLUDING RROW (S00275NR), K0011+360 - K0012+277.46; K0012+310 - K0016+340, BACONG, NEGROS ORIENTAL Research notesProject ID 16R00100. Status: Completed. Amount paid: 0.00. Start 2017-04-17 → Completion 2018-12-15. Coords 9.2223862,123.2844584. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/15/2018. | Dumaguete City Negros Oriental 3rd DEO | 2017 | 152,014,963.24 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-25H00053 | C | CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SEAWALL, BARANGAY NORTH POBLACION, JIMALALUD, NEGROS ORIENTAL Research notesProject ID 25H00053. Status: On-Going. Amount paid: 0.00. Start 2025-03-27 → Completion None. Coords 9.9775111,123.2011806. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 40.69% as of —. | Jimalalud Negros Island Region | 2025 | 149,649,360.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-17R00024 | C | IMPROVEMENT/ WIDENING OF METRO DUMAGUETE DIVERSION ROAD INCL. RROW, DUMAGUETE CITY, NEGROS ORIENTAL Research notesProject ID 17R00024. Status: Completed. Amount paid: 0.00. Start 2017-07-10 → Completion 2019-08-28. Coords 9.35993,123.27539. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 08/28/2019. | Dumaguete City Negros Oriental 2nd DEO | 2017 | 146,020,541.51 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20H00035 | C | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS DUMAGUETE NORTH RD-K0025+000-K0025+223, K0025+238-K0026+000, K0027+598-K0028+740, NEGROS ORIENTAL PROVINCE Research notesProject ID 20H00035. Status: Completed. Amount paid: 0.00. Start 2020-12-09 → Completion 2021-10-04. Coords 9.4951697,123.1746531. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 10/04/2021. | Dumaguete City Region VII | 2020 | 144,749,984.03 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-25HL0056 | C | ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE : SECONDARY ROADS: STA. CATALINA-PAMPLONA-TANJAY CITY - K0067 + 500 - K0072 + 000, STA. CATALINA, NEGROS ORIENTAL Research notesProject ID 25HL0056. Status: On-Going. Amount paid: 0.00. Start 2025-03-28 → Completion None. Coords 9.3925587,122.9319906. Program: Regular Infra. | Tanjay City Negros Oriental 3rd DEO | 2025 | 144,649,997.76 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-25HL0058 | C | ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE : SECONDARY ROADS: STA. CATALINA-PAMPLONA-TANJAY CITY - K0076 + 347 - K0080 + 847, STA. CATALINA, NEGROS ORIENTAL Research notesProject ID 25HL0058. Status: On-Going. Amount paid: 0.00. Start 2025-03-28 → Completion None. Coords 9.3529028,122.8878075. Program: Regular Infra. | Tanjay City Negros Oriental 3rd DEO | 2025 | 143,684,780.48 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-25HL0061 | C | ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE :TERTIARY ROADS: BAYAWAN-MABINAY RD. - K0133 + 216 - K0136 + 116, BAYAWAN CITY, NEGROS ORIENTAL Research notesProject ID 25HL0061. Status: On-Going. Amount paid: 0.00. Start 2025-03-28 → Completion None. Coords 9.5536583,122.8856018. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 54.49% as of —. | Bayawan City Negros Oriental 3rd DEO | 2025 | 143,632,614.42 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) / MG CONSTRUCTION (41069) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-25HL0057 | C | ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE : SECONDARY ROADS: STA. CATALINA-PAMPLONA-TANJAY CITY - K0072 + 000 - K0076 + 347, STA. CATALINA, NEGROS ORIENTAL Research notesProject ID 25HL0057. Status: On-Going. Amount paid: 0.00. Start 2025-03-28 → Completion None. Coords 9.3686866,122.9083252. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 86.34% as of —. | Tanjay City Negros Oriental 3rd DEO | 2025 | 139,824,473.51 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-16R00027 | C | ROAD UPGRADING (UNPAVED TO PAVED) OF MABINAY-AYUNGON ROAD, K0107+050 - K0108+184, K0108+236 - K0109+000, K0120+319 - K0120+348, K0121+692 - K0122+644, K0122+666 - K0122+886, K0123+084 - K0124+018, K0124+044 - K0125+000, AYUNGON, NEGROS ORIENTAL Research notesProject ID 16R00027. Status: Completed. Amount paid: 0.00. Start 2016-03-30 → Completion 2016-10-25. Coords None,None. Program: Regular Infra. | Ayungon Region VII | 2016 | 136,299,911.01 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18H00001 | C | ORGANIZATIONAL OUTCOME 1-ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, DUMAGUETE SOUTH ROAD, INCL ROW.SECTION 1: K0016+340-K0017+629; SECTON 2: K0017+674-K0017+979; SECTION 3: K0017+1012-K0019+984; SECTION 4: K Research notesProject ID 18H00001. Status: Completed. Amount paid: 0.00. Start 2018-03-02 → Completion 2019-10-10. Coords 9.181377,123.2559017. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 10/10/2019. | Dumaguete City Region VII | 2018 | 129,546,065.72 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18H00013 | C | ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING PRIMARY ROADS, DUMAGUETE NORTH RD (JCT. BAIS-KABANKALAN-NEGROS OCC. BDRY) K0058+507-K0061+940, K0071+500-K0073+200, NEGROS ORIENTAL PROVINCE Research notesProject ID 18H00013. Status: Completed. Amount paid: 0.00. Start 2018-03-09 → Completion 2019-11-21. Coords 9.335259,123.2759064. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 11/21/2019. | Bais City Region VII | 2018 | 122,872,534.79 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-25HL0060 | C | ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE :TERTIARY ROADS: BAYAWAN-MABINAY RD. - K0131 + 500 - K0133 + 216, BAYAWAN CITY, NEGROS ORIENTAL Research notesProject ID 25HL0060. Status: On-Going. Amount paid: 0.00. Start 2025-03-28 → Completion None. Coords 9.5390719,122.8892445. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 90.97% as of —. | Bayawan City Negros Oriental 3rd DEO | 2025 | 106,965,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) / TRIBATA CONSTRUCTION AND DEVELOPMENT (45088) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18H00026 | C | ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, PRIMARY ROADS, DUMAGUETE NORTH ROAD (DUMAGUETE-JCT. BAIS-KABANKALAN) INCLUDING ROW, K0039+000-K0042+732, NEGROS ORIENTAL PROVINCE Research notesProject ID 18H00026. Status: Completed. Amount paid: 0.00. Start 2018-03-20 → Completion 2019-08-15. Coords 9.5680551,123.1107322. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 08/15/2019. | Bais City Region VII | 2018 | 106,268,239.65 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-25HK0057 | C | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TANJAY RIVE Research notesProject ID 25HK0057. Status: On-Going. Amount paid: 0.00. Start 2025-02-21 → Completion None. Coords 9.5129108,123.1453869. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 55.11% as of —. | Tanjay City Negros Oriental 2nd DEO | 2025 | 102,222,450.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-19H00002 | C | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, METRO DUMAGUETE DIVERSION ROAD, (SECTION 1), NEGROS ORIENTAL, STA.00+576-STA.02+213, NEGROS ORIENTAL PROVINC Research notesProject ID 19H00002. Status: Completed. Amount paid: 0.00. Start 2019-07-05 → Completion 2021-10-31. Coords 9.320415,123.2721333. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 10/31/2021. | Dumaguete City Region VII | 2019 | 101,562,789.14 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-054 | C | 25HK0045 - Org Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program Research notesDPWH project ID 25HK0045, License 21962, status On-going, CPES visit/final /. Largest 2025 Philsouth flood-management contract in CPES 40th. Verify exact LGU from underlying DPWH NOA/contract. | Negros Oriental (province-wide) DPWH | 2025 | 101,267,100.00 | Philsouth Builders Inc. (Formerly: Lotiff Construction) | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| BGov-25HK0044 | C | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAMOGONG RIVER, BAIS CITY Research notesProject ID 25HK0044. Status: On-Going. Amount paid: 0.00. Start 2025-03-28 → Completion None. Coords 9.5824886,123.0939228. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 86.71% as of —. | Bais City Negros Oriental 2nd DEO | 2025 | 101,099,999.99 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18H00005 | C | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEV'T. PROGRAM-ROAD WIDENING-PRIMARY ROADS, DUMAGUETE SOUTH ROAD INCL ROW Research notesProject ID 18H00005. Status: Completed. Amount paid: 0.00. Start 2018-03-02 → Completion 2019-09-05. Coords 9.1488087,123.233828. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 09/05/2019. | Dumaguete City Region VII | 2018 | 101,099,950.06 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-013 | A | Design and Build: Construction/Improvement of Bayawan District Hospital | Bayawan City Provincial Government of Negros Oriental | 2025 | 99,899,665.33 | PHILSOUTH BUILDERS, INC. | Official LGU NOA page | View |
| REG-011 | A | Design and Build: Construction/Improvement of Bais District Hospital | Bais City Provincial Government of Negros Oriental | 2025 | 99,899,597.38 | PHILSOUTH BUILDERS, INC. | Official LGU NOA page | View |
| REG-012 | A | Design and Build: Construction/Improvement of Governor William 'Billy' Villegas Memorial Hospital | Negros Oriental (province-wide) Provincial Government of Negros Oriental | 2025 | 99,899,502.77 | PHILSOUTH BUILDERS, INC. | Official LGU NOA page | View |
| REG-025 | C | BIP - Flood Mitigation Structures Protecting Major/Strategic Public Buildings - Rehabilitation of Tanjay River Control Structure Research notesDPWH project ID 24HK0128, License 21962, status On-going, CPES visit/final 95.70%/. | Tanjay City DPWH | 2024 | 99,000,000.00 | PHILSOUTH BUILDERS INC. (Formerly: Lotiff Construction) | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| BGov-25HL0068 | C | CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP): PUBLIC WATER SUPPLY SYSTEM: IMPROVEMENT OF VALENCIA WATER SYSTEM,VALENCIA, NEGROS ORIENTAL Research notesProject ID 25HL0068. Status: On-Going. Amount paid: 0.00. Start 2025-06-18 → Completion None. Coords 9.3203788,123.1945008. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 4.92% as of —. | Valencia Negros Oriental 3rd DEO | 2025 | 98,899,960.51 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-018 | C | SIPAG - Flood Mitigation Structures Protecting Public Infrastructures/Facilities - Construction of Tamogong River Control Research notesDPWH project ID 23HK0063, License 21962, status Completed, CPES visit/final 82.90%/89.59%. | Negros Oriental (province-wide) DPWH | 2024 | 96,500,000.00 | PHILSOUTH BUILDERS INC. (Formerly: Lotiff Construction) | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| BGov-21HL0120 | C | CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - NATIONAL ROADS: DUMAGUETE SOUTH RD - K0031 + 023 - K0033 + 518, NEGROS ORIENTAL Research notesProject ID 21HL0120. Status: Completed. Amount paid: 0.00. Start 2022-04-07 → Completion 2023-02-12. Coords 9.0951386,123.1631194. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 02/12/2023. | Dumaguete City Negros Oriental 3rd DEO | 2021 | 96,500,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-21HL0002 | C | NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - METRO DUMAGUETE DIVERSION ROAD, PACKAGE 4, BACONG, NEGROS ORIENTAL Research notesProject ID 21HL0002. Status: Completed. Amount paid: 0.00. Start 2021-02-24 → Completion 2023-12-01. Coords 9.2190444,123.2797472. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/01/2023. | Dumaguete City Negros Oriental 3rd DEO | 2021 | 96,500,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-24HK0105 | C | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF TAMOGONG RIVER CONTROL STRUCTURE, BAIS CITY, NEGROS ORIENTAL Research notesProject ID 24HK0105. Status: Completed. Amount paid: 0.00. Start 2024-05-09 → Completion 2025-02-19. Coords 9.5818778,123.0889361. Program: Regular Infra. Sumbong sa Pangulo lists completion 09/07/2023; cost reported PHP 49,000,000.00. DPWH official transparency portal confirms accomplishment 100% as of 02/19/2025. | Bais City Negros Oriental 2nd DEO | 2024 | 96,500,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-22HK0072 | C | SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY STA. CRUZ NUEVO - BARANGAY PAL-EW - BARANGAY STO. NIÑ Research notesProject ID 22HK0072. Status: Completed. Amount paid: 0.00. Start 2022-03-24 → Completion 2022-12-18. Coords 9.50258,122.9143347. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/18/2022. | DPWH NegOr 2nd DEO area Negros Oriental 2nd DEO | 2022 | 96,500,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-24HL0018 | C | ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING :TERTIARY ROADS: DUMAGUETE CITY - VALENCIA - BACONG RD - K0012 + 095 - K0013 + 986 (K0012 + 095.00 - K0013 + 958.59), BACONG, NEGROS OR Research notesProject ID 24HL0018. Status: On-Going. Amount paid: 0.00. Start 2024-03-02 → Completion None. Coords 9.2654901,123.2693781. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 95.85% as of —. | Dumaguete City Negros Oriental 3rd DEO | 2024 | 96,500,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HL0019 | C | BRIDGE PROGRAM: WIDENING OF PERMANENT BRIDGES : MAG-ABO BRIDGE (B00008NR) ALONG DUMAGUETE SOUTH ROAD, ZAMBOANGUITA, NEGROS ORIENTAL Research notesProject ID 20HL0019. Status: Completed. Amount paid: 0.00. Start 2020-03-02 → Completion 2021-12-18. Coords 9.1373667,123.22255. Program: Regular Infra. | Dumaguete City Negros Oriental 3rd DEO | 2020 | 96,500,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HL0032 | C | NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING - TERTIARY ROADS : CONSTRUCTION OF BY-PASS AND DIVERSION ROADS: METRO DUMAGUETE DIVERSION ROAD, PACKAGE 2, BACONG, NEGROS ORIENTAL Research notesProject ID 20HL0032. Status: Completed. Amount paid: 0.00. Start 2020-03-12 → Completion 2021-12-02. Coords 9.2403883,123.28562. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/02/2021. | Dumaguete City Negros Oriental 3rd DEO | 2020 | 94,839,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-24HL0031 | C | ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: WIDENING OF PERMANENT BRIDGES: CANAWAY BR. (B00017NR) ALONG DUMAGUETE SOUTH RD., SIATON, NEGROS ORIENTAL Research notesProject ID 24HL0031. Status: Completed. Amount paid: 0.00. Start 2024-03-02 → Completion 2025-03-06. Coords 9.064125,123.0450361. Program: Regular Infra. | Dumaguete City Negros Oriental 3rd DEO | 2024 | 94,570,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-25HL0059 | C | ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE : TERTIARY ROADS: BAYAWAN-MABINAY RD. - K0129 + 600 - K0131 + 500, BAYAWAN CITY, NEGROS ORIENTAL Research notesProject ID 25HL0059. Status: On-Going. Amount paid: 0.00. Start 2025-03-28 → Completion None. Coords 9.5280371,122.9012087. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 53.67% as of —. | Bayawan City Negros Oriental 3rd DEO | 2025 | 94,469,744.67 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-21HK0084 | C | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES-CONSTRUCTION/ REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-RECONSTRUCTION/RE Research notesProject ID 21HK0084. Status: Completed. Amount paid: 0.00. Start 2021-10-22 → Completion 2022-10-31. Coords 9.32769,123.2633915. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 10/31/2022. | DPWH NegOr 2nd DEO area Negros Oriental 2nd DEO | 2021 | 93,605,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-25HL0047 | C | ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: WIDENING OF PERMANENT BRIDGES: MANTUYOP BR. (B00019NR) ALONG DUMAGUETE SOUTH RD, SIATON, NEGROS ORIENTAL Research notesProject ID 25HL0047. Status: On-Going. Amount paid: 0.00. Start 2025-02-19 → Completion None. Coords 9.0513908,123.0207613. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 81.01% as of —. | Dumaguete City Negros Oriental 3rd DEO | 2025 | 87,892,200.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-035 | C | Construction of Flood Mitigation Structure - Namangyan River Control Research notesDPWH project ID 24HK0054, License 21962, status On-going, CPES visit/final 97.20%/. | Negros Oriental (province-wide) DPWH | 2024 | 86,706,468.00 | PHILSOUTH BUILDERS INC. (Formerly: Lotiff Construction) | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| BGov-22HL0007 | C | ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING - PRIMARY ROADS: DUMAGUETE SOUTH RD - K0026 + 740 -K0028 + 940, ZAMBOANGUITA, NEGROS ORIENTAL Research notesProject ID 22HL0007. Status: Completed. Amount paid: 0.00. Start 2022-03-01 → Completion 2023-12-11. Coords 9.0974472,123.1909194. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/11/2023. | Dumaguete City Negros Oriental 3rd DEO | 2022 | 84,920,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-050 | C | 23HL0030 - Org Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance Research notesDPWH project ID 23HL0030, License 21962, status Completed, CPES visit/final /92.18%. NegOr-context inference based on adjacent rows; verify exact LGU from underlying DPWH NOA/contract. | Negros Oriental (province-wide) DPWH | 2023 | 83,955,000.00 | Philsouth Builders (Formerly: Lotiff Construction) | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| REG-014 | A | Construction of Cabanlutan Bridge, Bais City, Negros Oriental | Bais City Provincial Government of Negros Oriental | 2025 | 79,537,467.42 | PHILSOUTH BUILDERS INC. AND BIGFOOT CONSTRUCTION & SUPPLY - JOINT VENTURE | Official LGU NOA page | View |
| BGov-21HL0122 | C | CONSTRUCTION/IMPROVEMENT OF MULTI-PURPOSE BUILDING (PUBLIC MARKET) (PHASE II) IN DAUIN, NEGROS ORIENTAL Research notesProject ID 21HL0122. Status: Completed. Amount paid: 0.00. Start 2021-11-16 → Completion 2023-05-25. Coords 9.1907528,123.2640139. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 05/25/2023. | Dauin Negros Oriental 3rd DEO | 2021 | 78,384,890.97 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-22HJ0064 | C | BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - SAN JOSE BR. (B00531NR) ALONG DUMAGUETE NORTH RD (JCT. BAIS-KABANKALAN-NEGROS OCC. BDRY), LA LIBERTAD, NEGROS ORIENTAL Research notesProject ID 22HJ0064. Status: Completed. Amount paid: 0.00. Start 2022-03-30 → Completion 2023-11-26. Coords 10.005,123.2259. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 11/26/2023. | Bais City Negros Oriental 1st DEO | 2022 | 77,200,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-002 | A | Design and Build: Construction of Bridge - Reinforced Concrete Deck Girder (RCDG), Novallas, Tanjay City, Negros Oriental | Tanjay City Provincial Government of Negros Oriental | 2023 | 74,997,689.24 | PHILSOUTH BUILDERS INC. AND BIGFOOT CONSTRUCTION & SUPPLY (JOINT VENTURE) | Official LGU NOA page | View |
| BGov-23HL0015 | C | ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE - PRIMARY ROADS: DUMAGUETE SOUTH RD - K0020 + 000 - K0020 + 727, K0022 + 340 - K0022 + 944, DAUIN, NEGROS ORIENTAL Research notesProject ID 23HL0015. Status: Completed. Amount paid: 0.00. Start 2023-02-22 → Completion 2023-06-26. Coords 9.13852,123.22359. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 06/26/2023. | Dumaguete City Negros Oriental 3rd DEO | 2023 | 73,082,345.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) / UY CONDEV CORPORATION (FORMERLY:UY CONSTRUCTION & (12336) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-16R00041 | C | REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROAD ALONG BAIS-KABANKALAN ROAD, K0051+725- K0052+125, K0063+093- K0063+202, K0069+013- K0069+534, K0069+566- K0070+005, K0073+000- K0073+049, K0074+073- K0074+700, K0082+183- K0082+634 Research notesProject ID 16R00041. Status: Completed. Amount paid: 0.00. Start 2016-03-30 → Completion 2017-06-18. Coords 9.6305419,123.0872187. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 06/18/2017. | Bais City Region VII | 2016 | 72,945,910.28 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-23HJ0057 | C | OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-TERTIARY ROADS-GUIHULNGAN-BALOC-ISABELA RD- K0141+000-K0141+135, K0141+351-K0141+450, GUIHULNGAN Research notesProject ID 23HJ0057. Status: Completed. Amount paid: 0.00. Start 2023-03-24 → Completion 2023-10-16. Coords 10.1353017,123.1495567. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 10/16/2023. | Guihulngan City Negros Oriental 1st DEO | 2023 | 72,375,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18HL0080 | C | NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS: METRO DUMAGUETE DIVERSION ROAD (SECTION 2) INCLUDING ROW, BACONG, NEGROS ORIENTAL Research notesProject ID 18HL0080. Status: Completed. Amount paid: 0.00. Start 2018-08-15 → Completion 2021-12-11. Coords 9.0810766,123.077015. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/11/2021. | Dumaguete City Negros Oriental 3rd DEO | 2018 | 71,300,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-17R00027 | C | CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - BAIS - KABANKALAN ROAD, K0053+020 - K0053+200 R/S; K0060+700 - K0060+980 R/S; K0061+053 - K0061+258 B/S; K0061+295 - K0061+372 B/S; K0061+766 - K0061+902 R/S; K0062+091 - K0062+140 B/S; K0062+247 - K0062+2 Research notesProject ID 17R00027. Status: Completed. Amount paid: 0.00. Start 2017-07-31 → Completion 2019-07-21. Coords 9.6304047,123.0826779. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 07/21/2019. | Bais City Negros Oriental 2nd DEO | 2017 | 70,492,870.96 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HK0090 | C | LOCAL INFRASTRUCTURE PROGRAM- NATIONAL ROAD-ASPHALT OVERLAY ALONG DUMAGUETE NORTH ROAD (DUMAGUETE-JCT. BAIS-KABANKALAN) K0036+500-K0039+512, BAIS CITY, NEGROS ORIENTAL Research notesProject ID 20HK0090. Status: Completed. Amount paid: 0.00. Start 2020-11-24 → Completion 2021-08-17. Coords 9.5295747,123.113683. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 08/17/2021. | Bais City Negros Oriental 2nd DEO | 2020 | 67,887,824.76 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-036 | C | Bridge Program - Widening of San Jose Br. (B00531NR) along Dumaguete North Rd (Jct. Bais-Kabankalan - Negros Occidental Bdry.) Research notesDPWH project ID 23HJ0008, License 21962, status On-going, CPES visit/final 93.60%/. | Dumaguete City DPWH | 2024 | 67,550,000.00 | PHILSOUTH BUILDERS INC. (Formerly: Lotiff Construction) | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| REG-051 | C | 22HK0042 - Org Outcome 2: Protect Lives and Properties Against Major Floods (Flood control project, NegOr context) Research notesDPWH project ID 22HK0042, License 21962, status On-going, CPES visit/final /. Same project_id appears in CPES 35th. Verify exact LGU from underlying DPWH NOA/contract. | Negros Oriental (province-wide) DPWH | 2023 | 67,550,000.00 | Philsouth Builders (Formerly: Lotiff Construction) | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| BGov-18HL0020 | C | CONST/IMPV'T. OF ACCESS RDS LEADING TO TOURISM DEST.: ACCESS RD LEADING TO CASARORO FALLS, VALENCIA, Research notesProject ID 18HL0020. Status: Completed. Amount paid: 0.00. Start 2018-02-25 → Completion 2019-03-06. Coords 9.3071966,123.2502197. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 03/06/2019. | Valencia Negros Oriental 3rd DEO | 2018 | 67,550,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-22HK0043 | C | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - RECONSTRUCTION OF TAMOGONG RIVER CONTROL, BAIS CITY, NEGROS ORIENTAL Research notesProject ID 22HK0043. Status: Completed. Amount paid: 0.00. Start 2022-02-18 → Completion 2022-12-07. Coords 9.5819122,123.0955792. Program: Regular Infra. Sumbong sa Pangulo lists completion 12/07/2022; cost reported PHP 67,550,000.00. DPWH official transparency portal confirms accomplishment 100% as of 12/07/2022. | Bais City Negros Oriental 2nd DEO | 2022 | 67,550,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-024 | C | Network Development Program - Construction of By-Pass and Diversion Roads, Metro Dumaguete Diversion Road Research notesDPWH project ID 24HK0073, License 21962, status On-going, CPES visit/final 89.90%/. | Dumaguete City DPWH | 2025 | 66,500,000.00 | PHILSOUTH BUILDERS INC. (Formerly: Lotiff Construction) | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| BGov-22HL0063 | C | ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS: METRO DUMAGUETE DIVERSION ROAD, PACKAGE 4, BACONG, NEGROS ORIENTAL Research notesProject ID 22HL0063. Status: Completed. Amount paid: 0.00. Start 2022-03-01 → Completion 2024-03-31. Coords 9.2370167,123.2863. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 03/31/2024. | Dumaguete City Negros Oriental 3rd DEO | 2022 | 66,500,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-21HL0007 | C | BRIDGE - WIDENING OF PERMANENT BRIDGES: WIDENING OF BRIDGE - MALUAY BRIDGE (B00009NR) ALONG DUMAGUETE SOUTH ROAD, ZAMBOANGUITA, NEGROS ORIENTAL Research notesProject ID 21HL0007. Status: Completed. Amount paid: 0.00. Start 2021-02-24 → Completion 2022-03-22. Coords 9.1271334,123.2136633. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 03/22/2022. | Dumaguete City Negros Oriental 3rd DEO | 2021 | 65,620,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-21HK0101 | C | LOCAL PROGRAM: LOCAL ROADS AND BRIDGES: LOCAL ROADS: CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF ROAD IN BRGY. CAMBAGAHAN, BAIS CITY, NEGROS ORIENTAL Research notesProject ID 21HK0101. Status: Completed. Amount paid: 0.00. Start 2021-09-29 → Completion 2022-07-06. Coords 9.5869833,122.9102028. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 07/06/2022. | Bais City Negros Oriental 2nd DEO | 2021 | 63,690,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-23HL0010 | C | BRIDGE PROGRAM: REPLACEMENT OF PERMANENT WEAK BRIDGES: BALAYAG MANOK BRIDGE 1 (B00451NR) ALONG DUMAGUETE CITY-VALENCIA-BACONG RD., VALENCIA, NEGROS ORIENTAL Research notesProject ID 23HL0010. Status: Completed. Amount paid: 0.00. Start 2023-02-23 → Completion 2024-01-29. Coords 9.2751507,123.2534067. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 01/29/2024. | Dumaguete City Negros Oriental 3rd DEO | 2023 | 63,690,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HL0034 | C | NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING - PRIMARY ROADS : DUMAGUETE SOUTH RD - K0006 + (-649) - K0006 + 567, K0006 +594 - K0006 +750, K0007 + 016 - K0007 + 188, BACONG, NEGROS ORIENTAL Research notesProject ID 20HL0034. Status: Completed. Amount paid: 0.00. Start 2020-12-08 → Completion 2021-11-28. Coords 9.257725,123.2944972. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 11/28/2021. | Dumaguete City Negros Oriental 3rd DEO | 2020 | 62,725,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-010 | A | Improvement of School Facilities for Public Schools under DepEd, Negros Oriental Division | Negros Oriental (province-wide) Provincial Government of Negros Oriental | 2024 | 58,795,000.00 | PHILSOUTH BUILDERS INC. | Official LGU NOA page | View |
| BGov-20HL0023 | C | ASSET PRESERVATION PROGRAM - PREVENTIVE - PRIMARY ROADS: REHABILITATION/ RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROAD: DUMAGUETE SOUTH ROAD - K0024 + 980- K0026 + 200, ZAMBOANGUITA, NEGROS ORIENTAL Research notesProject ID 20HL0023. Status: Completed. Amount paid: 0.00. Start 2020-02-21 → Completion 2021-03-15. Coords 9.1161514,123.2043469. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 03/15/2021. | Dumaguete City Negros Oriental 3rd DEO | 2020 | 57,900,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-17HL0103 | C | CONST./IMPV'T. OF ACCESS RDS LEADING TO DECLARED TOURISM DESTINATION: ACCESS RDS. LEADING TO MT. TALINIS, DAUIN, NEGROS ORIENTAL Research notesProject ID 17HL0103. Status: Completed. Amount paid: 0.00. Start 2018-02-25 → Completion 2018-12-28. Coords 9.2135034,123.218478. Program: Regular Infra. | Dauin Negros Oriental 3rd DEO | 2018 | 57,900,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-053 | C | 25HK0056 - Org Outcome 2: Flood Management Program - Construction/Maintenance of Flood Mitigation Structures, Bio-os River area (Zamboanguita / Negros Oriental 3rd DEO context) Research notesDPWH project ID 25HK0056, License 24769 / 21962 / JV, status On-going, CPES visit/final /. Same JV as 25HK0050. Verify exact LGU. | Zamboanguita DPWH | 2025 | 54,397,697.00 | Bigfoot Construction & Supply / Philsouth Builders Inc. (Formerly: Lotiff Construction) (JV) | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| BGov-21HK0137 | C | CONSTRUCTION OF TWO (2) UNITS THREE (3) STOREY NINE (9) CLASSROOM SCHOOL BUILDING AT PAMPLONA CENTRAL ELEMENTARY SCHOOL, PAMPLONA, NEGROS ORIENTAL Research notesProject ID 21HK0137. Status: Completed. Amount paid: 0.00. Start 2021-10-22 → Completion 2023-05-30. Coords 9.4716181,123.1196911. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 05/30/2023. | Pamplona Negros Oriental 2nd DEO | 2021 | 54,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-16R00055 | C | CONSTRUCTION OF METRO DUMAGUETE DIVERSION ROAD, INCLUDING ROW, DUMAGUETE-SIBULAN ROAD, NEGROS ORIENTAL 2ND LD Research notesProject ID 16R00055. Status: Completed. Amount paid: 0.00. Start 2016-06-02 → Completion 2021-12-04. Coords None,None. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/04/2021. | Dumaguete City Region VII | 2016 | 53,865,771.36 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-23HK0070 | C | CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-REHABILITATION OF LUMBANGAN RIVER CONTROL, MABINAY, NEGROS ORIENTAL Research notesProject ID 23HK0070. Status: Completed. Amount paid: 0.00. Start 2023-02-17 → Completion 2023-11-30. Coords 9.6863889,122.9490333. Program: Regular Infra. Sumbong sa Pangulo lists completion 11/30/2023; cost reported PHP 53,557,500.00. DPWH official transparency portal confirms accomplishment 100% as of 11/30/2023. | Mabinay Negros Oriental 2nd DEO | 2023 | 53,557,500.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-23HK0117 | C | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, WIDENING OF PERMANENT BRIDGES, OCOY BR. (B00074NR) ALONG DUMAGUETE NORTH ROAD (DUMAGUETE - JCT. BAIS - KABANKALAN), SIBULAN, NEGROS ORIENTAL Research notesProject ID 23HK0117. Status: On-Going. Amount paid: 0.00. Start 2023-04-05 → Completion None. Coords 9.3622101,123.27355. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 61.83% as of —. | Bais City Negros Oriental 2nd DEO | 2023 | 52,388,588.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) / R.E. SINGSON CONSTRUCTION AND DEVELOPMENT INC. (FORMERLY: R.E. SINGSON CONSTRUCTION) (24556) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-047 | C | Preventive Maintenance: Primary Roads - Asphalt Overlay along Bais-Kabankalan Road K0079+000-K0080+937, K0080+959-K0082+175 Research notesDPWH project ID (no-id, eval 2019), License 21962, status On-going, CPES visit/final 89.80%/. | Kabankalan (NegOcc — DPWH route) DPWH Negros Oriental 2nd DEO | 2019 | 51,423,000.00 | Philsouth Builders | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| BGov-21HK0066 | C | ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING-PRIMARY ROADS @ DUMAGUETE NORTH ROAD (DUMAGUETE-JCT BAIS-KABANKALAN) K0006+1082-K0008+400, SIBULAN, NEGROS ORIENTAL Research notesProject ID 21HK0066. Status: Completed. Amount paid: 0.00. Start 2021-02-11 → Completion 2023-01-19. Coords 9.3633508,123.2722419. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 01/19/2023. | Bais City Negros Oriental 2nd DEO | 2021 | 49,562,400.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-21HK0082 | C | LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-REHABILITATION OF MULTI-PURPOSE FACILITIES AT GOV. MARIANO PERDICES MEMORIAL COLISEUM, DUMAGUETE CITY, NEGROS ORIENTAL Research notesProject ID 21HK0082. Status: Completed. Amount paid: 0.00. Start 2021-03-03 → Completion 2021-08-24. Coords 9.3137247,123.2996031. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 08/24/2021. | Dumaguete City Negros Oriental 2nd DEO | 2021 | 49,500,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-22HL0094 | C | BASIC INFRASTRUCTURE PROGRAM (BIP): FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF SAN FRANCISCO RIVER CONTROL, STA. CATALINA, NEGROS ORIENTAL Research notesProject ID 22HL0094. Status: Completed. Amount paid: 0.00. Start 2022-04-07 → Completion 2023-01-09. Coords 9.1850325,122.8959969. Program: Regular Infra. Sumbong sa Pangulo lists completion 01/09/2023; cost reported PHP 49,500,000.00. DPWH official transparency portal confirms accomplishment 100% as of 01/09/2023. | Santa Catalina Negros Oriental 3rd DEO | 2022 | 49,500,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-019 | C | CSSP/SIPAG: Access Roads/Bridges from National Road - Construction of Candugay-Casalaan Road Research notesDPWH project ID 23H0077, License 21962 / 52484 / JV-23-10709, status Completed, CPES visit/final /91.18%. | Negros Oriental (province-wide) DPWH | 2024 | 49,000,000.00 | PHILSOUTH BUILDERS INC. (Formerly: Lotiff Construction) / 4AB Construction and Supplies CE Construction (JV) | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| REG-021 | C | CSSP/SIPAG: Access Roads/Bridges - Construction of Candugay-Casalaan Road Research notesDPWH project ID 23HL0077, License 21962 / 24525 / JV-23-10709, status On-going, CPES visit/final 92.70%/. Possible overlap with 23H0077 (same project label, different project ID, different JV partner roster) — verify with DPWH to confirm whether two contracts or duplicate listing. | Negros Oriental (province-wide) DPWH | 2023 | 49,000,000.00 | PHILSOUTH BUILDERS INC. (Formerly: Lotiff Construction) / Richfield Builders, Inc. (JV) | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| REG-037 | C | National Building Program: Construction of Two-Storey DPWH Building with Landscaping, Barangay Matabuhan Research notesDPWH project ID 23HL00102, License 21962 / 52484 / JV-23-11536, status On-going, CPES visit/final 93.60%/. | Negros Oriental (province-wide) DPWH | 2024 | 49,000,000.00 | PHILSOUTH BUILDERS INC. (Formerly: Lotiff Construction) / 4AB Construction and Supplies CE Construction (JV) | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| BGov-23HK0062 | C | ORGANIZATIONAL OUTCOME 2: PROTECT LIVE AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF OCOY RIVER CONTROL, MAGAT Research notesProject ID 23HK0062. Status: Completed. Amount paid: 0.00. Start 2023-02-06 → Completion 2023-09-20. Coords 9.3358689,123.2684011. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 09/20/2023. | DPWH NegOr 2nd DEO area Negros Oriental 2nd DEO | 2023 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-23HK0040 | C | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE - PRIMARY ROADS: BAIS-KABANKALAN ROAD - K0063+093-K0064+000, K0069+000-K0069+538, K0071+395-K0072+000, MABINAY, NEGROS ORIENTAL Research notesProject ID 23HK0040. Status: Completed. Amount paid: 0.00. Start 2023-04-14 → Completion 2023-07-31. Coords 9.6101389,123.0352306. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 07/31/2023. | Bais City Negros Oriental 2nd DEO | 2023 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HK0016 | C | ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE:PRIMARY ROADS, ASPHALT OVERLAY ALONG DUMAGUETE NORTH ROAD (DUMAGUETE-JCT BAIS-KABANKALAN) K0032+731-K0035+046, NEGROS ORIENTAL Research notesProject ID 20HK0016. Status: Completed. Amount paid: 0.00. Start 2020-12-02 → Completion 2021-05-14. Coords 9.5243261,123.1250976. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 05/14/2021. | Bais City Negros Oriental 2nd DEO | 2020 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-21HL0043 | C | 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF CANAWAY RIVER CONTROL (UPSTREAM B), SIATON, NEGROS ORIEN Research notesProject ID 21HL0043. Status: Completed. Amount paid: 0.00. Start 2021-02-19 → Completion 2022-02-01. Coords 9.0649933,123.0443383. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 02/01/2022. | Siaton Negros Oriental 3rd DEO | 2021 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-23HK0059 | C | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF TANJAY RIVER CONTROL Research notesProject ID 23HK0059. Status: Completed. Amount paid: 0.00. Start 2023-02-06 → Completion 2023-11-26. Coords 9.4722931,123.1098917. Program: Regular Infra. Sumbong sa Pangulo lists completion 10/24/2023; cost reported PHP 49,000,000.00. DPWH official transparency portal confirms accomplishment 100% as of 11/26/2023. | Tanjay City Negros Oriental 2nd DEO | 2023 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-22HL0093 | C | SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF PALINPINON RIVER CONTROL STRUCTURE, VALENCIA, NEGROS ORIENTAL Research notesProject ID 22HL0093. Status: Completed. Amount paid: 0.00. Start 2022-04-07 → Completion 2022-11-13. Coords 9.3167175,123.2499717. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 11/13/2022. | Valencia Negros Oriental 3rd DEO | 2022 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-22HL0077 | C | SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF OMANOD RIVER CONTROL STRUCTURE, STA. CATALINA, NEGROS ORIENTAL Research notesProject ID 22HL0077. Status: Completed. Amount paid: 0.00. Start 2022-04-07 → Completion 2023-03-08. Coords 9.1672597,122.9066919. Program: Regular Infra. Sumbong sa Pangulo lists completion 03/08/2023; cost reported PHP 49,000,000.00. DPWH official transparency portal confirms accomplishment 100% as of 03/08/2023. | Santa Catalina Negros Oriental 3rd DEO | 2022 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-23HK0060 | C | ORGANIZATIONAL OUTCOME 2: PROTECT LIVE AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF TAMOGONG RIVER CONTROL, B Research notesProject ID 23HK0060. Status: Completed. Amount paid: 0.00. Start 2023-02-13 → Completion 2023-09-07. Coords 9.5815081,123.09665. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 09/07/2023. | DPWH NegOr 2nd DEO area Negros Oriental 2nd DEO | 2023 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-22HK0038 | C | SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ROAD, BRGY. SAB-AHAN, BAIS CITY, NEGROS ORIENTAL Research notesProject ID 22HK0038. Status: Completed. Amount paid: 0.00. Start 2022-02-22 → Completion 2022-09-04. Coords 9.5931967,122.952755. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 09/04/2022. | Bais City Negros Oriental 2nd DEO | 2022 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-23HK0090 | C | ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-FLOOD MANAGEMENT PROGRAM-REHABILITATION OF TANJAY RIVER CONTROL, PAMPLONA SECT Research notesProject ID 23HK0090. Status: Completed. Amount paid: 0.00. Start 2023-04-11 → Completion 2023-10-24. Coords 9.4704881,123.1087133. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 10/24/2023. | Tanjay City Negros Oriental 2nd DEO | 2023 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-23HK0041 | C | ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM:ASSET PRESERVATION PROGRAM:PREVENTIVE MAINTENANCE-PRIMARY ROADS: BAIS-KABANKALAN ROAD- K0072+000-K0074+285, MABINAY, NEGROS ORIENTAL Research notesProject ID 23HK0041. Status: Completed. Amount paid: 0.00. Start 2023-04-14 → Completion 2023-09-19. Coords 9.6612889,123.0060111. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 09/19/2023. | Bais City Negros Oriental 2nd DEO | 2023 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HK0025 | C | ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE: PRIMARY ROADS-ASPHALT OVERLAY ALONG BAIS-KABANKALAN ROAD, K0054+000-K0055+358; K0057+000-K0057+623, NEGROS ORIENTAL Research notesProject ID 20HK0025. Status: Completed. Amount paid: 0.00. Start 2020-12-02 → Completion 2021-08-18. Coords 9.6257115,123.0815689. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 08/18/2021. | Bais City Negros Oriental 2nd DEO | 2020 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-23HK0037 | C | ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM:ASSET PRESERVATION PROGRAM:PREVENTIVE MAINTENANCE-PRIMARY ROADS: BAIS-KABANKALAN RD- K0091+000-0093+277, MABINAY, NEGROS ORIENTAL Research notesProject ID 23HK0037. Status: Completed. Amount paid: 0.00. Start 2023-04-14 → Completion 2023-08-28. Coords 9.7664006,122.9357019. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 08/28/2023. | Bais City Negros Oriental 2nd DEO | 2023 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HJ0002 | C | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL ALONG BRGY. SAN JOSE, MANJUYOD, NEGROS ORIENTAL Research notesProject ID 20HJ0002. Status: Completed. Amount paid: 0.00. Start 2020-02-09 → Completion 2020-11-19. Coords 9.6688306,123.1449139. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 11/19/2020. | Manjuyod Negros Oriental 1st DEO | 2020 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-23HK0036 | C | ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM:ASSET PRESERVATION PROGRAM:PREVENTIVE MAINTENANCE-PRIMARY ROADS:BAIS-KABANKALAN RD- K0056+194-K0057+000, K0059+135-K0060+145, BAIS CITY, NEGROS ORIETAL Research notesProject ID 23HK0036. Status: Completed. Amount paid: 0.00. Start 2023-05-08 → Completion 2023-08-24. Coords 9.6225111,123.0693639. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 08/24/2023. | Bais City Negros Oriental 2nd DEO | 2023 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18HL0006 | C | CONST/MAINT. OF FLOOD MITIGATION STRUCTURES. . CONST. OF LICOLICO RIVER CONTROL UPSTREAM AND DOWNST Research notesProject ID 18HL0006. Status: Completed. Amount paid: 0.00. Start 2018-02-08 → Completion 2018-12-09. Coords 9.1176525,122.9265008. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/09/2018. | DPWH NegOr 3rd DEO area Negros Oriental 3rd DEO | 2018 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-23HK0039 | C | ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM:ASSET PRESERVATION PROGRAM:PREVENTIVE MAINTENANCE-PRIMARY ROADS: BAIS-KABANKALAN RD-K0082+175-K0084+000, K0088+500-K0088+910, MABINAY, NEGROS ORIENTAL Research notesProject ID 23HK0039. Status: Completed. Amount paid: 0.00. Start 2023-04-14 → Completion 2023-07-31. Coords 9.7403167,122.9401722. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 07/31/2023. | Bais City Negros Oriental 2nd DEO | 2023 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-21HK0077 | C | LOCAL PROGRAM: LOCAL ROADS AND BRIDGES: LOCAL ROADS: CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF ROAD, BRGY. SAB-AHAN, BAIS CITY, NEGROS ORIENTAL Research notesProject ID 21HK0077. Status: Completed. Amount paid: 0.00. Start 2021-09-13 → Completion 2022-09-13. Coords 9.5939389,123.0202861. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 09/13/2022. | Bais City Negros Oriental 2nd DEO | 2021 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-23HL0058 | C | ORGANIZATIONAL OUTCOME 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF BAYAWAN RIVER CONTROL DO Research notesProject ID 23HL0058. Status: Completed. Amount paid: 0.00. Start 2023-03-29 → Completion 2024-03-22. Coords 9.3686244,122.8004586. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 03/22/2024. | Bayawan City Negros Oriental 3rd DEO | 2023 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HL0074 | C | ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS: DUMAGUETE SOUTH RD- K0007 + 435 - K0007+ 703, K0031 + 470 - K0032 + 000, K0033+040 - K0033 + 686, K0034 + 348 - K0034+797, BACONG & ZAMBOANGUITA, NEGROS ORIENTAL Research notesProject ID 20HL0074. Status: Completed. Amount paid: 0.00. Start 2020-04-21 → Completion 2020-10-03. Coords 9.25349,123.29495. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 10/03/2020. | Dumaguete City Negros Oriental 3rd DEO | 2020 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-21HK0085 | C | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES-CONSTRUCTION/ REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-CONSTRUCTION OF O Research notesProject ID 21HK0085. Status: Completed. Amount paid: 0.00. Start 2021-10-15 → Completion 2022-08-20. Coords 9.3252906,123.2606751. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 08/20/2022. | DPWH NegOr 2nd DEO area Negros Oriental 2nd DEO | 2021 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-22HL0078 | C | SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF RIVER CONTROL STRUCTURE , STA. CATALINA, NEGROS ORIENTAL (PAGTIGAON RIVER CONTROL) Research notesProject ID 22HL0078. Status: Completed. Amount paid: 0.00. Start 2022-04-07 → Completion 2022-11-01. Coords 9.3500064,122.8453033. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 11/01/2022. | Santa Catalina Negros Oriental 3rd DEO | 2022 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-23HL0102 | C | LOCAL PROGRAM: NATIONAL BUILDING PROGRAM (NBP): BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES: CONSTRUCTION OF TWO-STOREY DPWH BUILDING WITH LANDSCPAING (LANDSCAPING), BARANGAY MATABUHAN, SIATON, NEGROS ORIENTAL Research notesProject ID 23HL0102. Status: Completed. Amount paid: 0.00. Start 2023-09-07 → Completion 2024-07-22. Coords 9.081075,123.0767528. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 07/22/2024. | Siaton Negros Oriental 3rd DEO | 2023 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) / 4AB CONSTRUCTIONANDSUPPLIES CIVIL ENGINEERING CONSTRUCTION (52484) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HL0020 | C | CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER CONTROL ALONG STA. CATALINA RIVER BASIN, STA. CATALINA, NEGROS ORIENTAL Research notesProject ID 20HL0020. Status: Completed. Amount paid: 0.00. Start 2020-02-17 → Completion 2020-12-15. Coords 9.3343972,122.8708558. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/15/2020. | Santa Catalina Negros Oriental 3rd DEO | 2020 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-23HK0091 | C | ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-FLOOD MANAGEMENT PROGRAM-REHABILITATION OF BIO-OS RIVER CONTROL, AMLAN, NEGROS Research notesProject ID 23HK0091. Status: Completed. Amount paid: 0.00. Start 2023-04-11 → Completion 2024-01-21. Coords 9.4655056,123.1930472. Program: Regular Infra. Sumbong sa Pangulo lists completion 01/21/2024; cost reported PHP 49,000,000.00. DPWH official transparency portal confirms accomplishment 100% as of 01/21/2024. | Amlan Negros Oriental 2nd DEO | 2023 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HL0002 | C | CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CANAWAY RIVER CONTROL (DOWNSTREAM A), SIATON, NEGROS ORIENTAL Research notesProject ID 20HL0002. Status: Completed. Amount paid: 0.00. Start 2020-02-17 → Completion 2020-11-09. Coords 9.0594414,123.0451342. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 11/09/2020. | Siaton Negros Oriental 3rd DEO | 2020 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-22HL0098 | C | SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG BANICA RIVER, VALENCIA, NEGROS ORIENTAL Research notesProject ID 22HL0098. Status: Completed. Amount paid: 0.00. Start 2022-04-07 → Completion 2023-02-14. Coords 9.3118,123.2553. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 02/14/2023. | Valencia Negros Oriental 3rd DEO | 2022 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-17HL0104 | C | CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF SAN FRANCISCO RIVER CONTROL UPSTREAM A & B, STA. CATALINA, NEGROS ORIENTAL Research notesProject ID 17HL0104. Status: Completed. Amount paid: 0.00. Start 2018-02-08 → Completion 2019-03-19. Coords 9.184794,122.8975952. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 03/19/2019. | Santa Catalina Negros Oriental 3rd DEO | 2018 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-17HL0017 | C | CONST./IMPV'T OF ACCESS ROADS LEADING TO TOURISM DEST.: RD TO MT. TALINIS, DAUIN, NEGROS ORIENTAL Research notesProject ID 17HL0017. Status: Completed. Amount paid: 0.00. Start 2017-04-16 → Completion 2017-12-04. Coords None,None. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/04/2017. | Dauin Negros Oriental 3rd DEO | 2017 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| SUMBONG-NEG-016 | C | Construction of River Control Structure, Sta. Catalina, Negros Oriental Research notesSumbong sa Pangulo confirms project as completed 11/01/2022 with cost PHP 49,000,000.00. | Santa Catalina DPWH (per Sumbong sa Pangulo flood-control register) | 2022 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) | Sumbong sa Pangulo flood-control register (DPWH-sourced citizen-monitoring portal) | View |
| SUMBONG-NEG-019 | C | Construction of Ocoy River Control, Calabnugan, Sibulan, Negros Oriental Research notesSumbong sa Pangulo confirms project as completed 08/20/2022 with cost PHP 49,000,000.00. | Sibulan DPWH (per Sumbong sa Pangulo flood-control register) | 2022 | 49,000,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) | Sumbong sa Pangulo flood-control register (DPWH-sourced citizen-monitoring portal) | View |
| BGov-18HL0009 | C | CONST/REHAB OF FLOOD CONTROL MITIGATION. . CONST OF RIVER CONTROL ALONG STA. CATALINA RIVER BASIN UP Research notesProject ID 18HL0009. Status: Completed. Amount paid: 0.00. Start 2018-02-08 → Completion 2018-12-09. Coords 9.3288483,122.8735875. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/09/2018. | Santa Catalina Negros Oriental 3rd DEO | 2018 | 48,990,039.33 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-19HK0010 | C | ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE: PRIMARY ROADS, ASPHALT OVERLAY ALONG BAIS-KABANKALAN ROAD K0079+069-K0080+938, K0080+959-K0082+175, NEGROS ORIENTAL Research notesProject ID 19HK0010. Status: Completed. Amount paid: 0.00. Start 2019-07-23 → Completion 2020-05-04. Coords 9.6941124,122.9399988. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 05/04/2020. | Bais City Negros Oriental 2nd DEO | 2019 | 48,849,333.68 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HJ0049 | C | ASSET PRESERVATION PROGRAM -PREVENTIVE MAINTENANCE PRIMARY ROADS - DUMAGUETE NORTH RD (JCT BAIS-KABANKALAN-NEGROS OCC BDRY), MANJUYOD, NEGROS ORIENTAL Research notesProject ID 20HJ0049. Status: Completed. Amount paid: 0.00. Start 2020-02-09 → Completion 2020-06-08. Coords 9.6373167,123.1008278. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 06/08/2020. | Bais City Negros Oriental 1st DEO | 2020 | 48,739,320.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-25HK0079 | C | BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS COMPLEX), MABINAY, NEGROS ORIENTAL Research notesProject ID 25HK0079. Status: On-Going. Amount paid: 0.00. Start 2025-05-23 → Completion None. Coords 9.7038145,122.9283073. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 25.04% as of —. | Mabinay Negros Oriental 2nd DEO | 2025 | 48,510,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-25HL0050 | C | CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF BUNTIS - CALANGAG ACCES Research notesProject ID 25HL0050. Status: On-Going. Amount paid: 0.00. Start 2025-02-19 → Completion None. Coords 9.238777,123.280876. Program: Regular Infra. | DPWH NegOr 3rd DEO area Negros Oriental 3rd DEO | 2025 | 48,510,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-21HL0001 | C | NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING ALONG PRIMARY ROADS: DUMAGUETE SOUTH ROAD - K0024 + 980 -K0026 + 261, ZAMBOANGUITA, NEGROS ORIENTAL Research notesProject ID 21HL0001. Status: Completed. Amount paid: 0.00. Start 2021-02-24 → Completion 2021-11-13. Coords 9.1155928,123.2038058. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 11/13/2021. | Dumaguete City Negros Oriental 3rd DEO | 2021 | 48,323,340.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HL0076 | C | ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS: DUMAGUETE SOUTH RD- K0042 + 252 - K0043 + 500, K0066 + 387 - K0067 + 000, SIATON, NEGROS ORIENTAL Research notesProject ID 20HL0076. Status: Completed. Amount paid: 0.00. Start 2020-04-20 → Completion 2020-06-18. Coords 9.0936458,123.0871853. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 06/18/2020. | Dumaguete City Negros Oriental 3rd DEO | 2020 | 48,111,140.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-25HK0075 | C | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG DUMAGUETE SOUTH ROAD K0002+470-K0003+770 Research notesProject ID 25HK0075. Status: On-Going. Amount paid: 0.00. Start 2025-03-21 → Completion None. Coords 9.2981754,123.3019836. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 29.96% as of —. | Dumaguete City Negros Oriental 2nd DEO | 2025 | 47,972,509.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-22HL0042 | C | ORGANIZATIONAL OUTCOME 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF RIVER CONTROL ALONG Research notesProject ID 22HL0042. Status: Completed. Amount paid: 0.00. Start 2022-03-07 → Completion 2022-10-13. Coords 9.1670958,122.9058922. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 10/13/2022. | DPWH NegOr 3rd DEO area Negros Oriental 3rd DEO | 2022 | 47,804,400.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| SUMBONG-NEG-018 | C | Rehabilitation of River Control along Sta. Catalina River Basin, Upstream B, Sta. Catalina, Negros Oriental Research notesSumbong sa Pangulo confirms project as completed 10/13/2022 with cost PHP 47,804,400.00. | Santa Catalina DPWH (per Sumbong sa Pangulo flood-control register) | 2022 | 47,804,400.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) | Sumbong sa Pangulo flood-control register (DPWH-sourced citizen-monitoring portal) | View |
| BGov-16HL0129 | C | CONSTRUCTION OF CANAWAY RIVER CONTROL DOWNSTREAM B, SAN JOSE, SIATON, NEGROS ORIENTAL Research notesProject ID 16HL0129. Status: Completed. Amount paid: 0.00. Start 2017-04-05 → Completion 2018-02-22. Coords 9.055892,123.040802. Program: Regular Infra. | San Jose Negros Oriental 3rd DEO | 2017 | 47,778,930.38 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-052 | C | 25HK0050 - Org Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures, Bio-os River area (Zamboanguita / Negros Oriental 3rd DEO context) Research notesDPWH project ID 25HK0050, License 24769 / 21962 / JV, status On-going, CPES visit/final /. Bio-os River traverses Zamboanguita and other 3rd DEO LGUs. Verify exact LGU. | Zamboanguita DPWH | 2025 | 47,752,268.00 | Bigfoot Construction & Supply / Philsouth Builders Inc. (Formerly: Lotiff Construction) (JV) | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| BGov-16HL0022 | C | CONCRETING OF ROAD LEADING TO BASLAY TWIN (HOT AND COLD SPRING), DAUIN, NEGROS ORIENTAL Research notesProject ID 16HL0022. Status: Completed. Amount paid: 0.00. Start 2016-03-23 → Completion 2016-11-10. Coords 9.2135419,123.21804. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 11/10/2016. | Dauin Negros Oriental 3rd DEO | 2016 | 47,024,941.97 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-16HL0012 | C | CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD. . IMPROVEMENT OF ROAD LEADING TO MT. TALINIS (LIPAYO-MAGSA Research notesProject ID 16HL0012. Status: Completed. Amount paid: 0.00. Start 2016-04-07 → Completion 2016-11-29. Coords 9.2249118,123.2434155. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 11/29/2016. | DPWH NegOr 3rd DEO area Negros Oriental 3rd DEO | 2016 | 46,549,994.84 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-042 | C | Construction of Canaway River Control Downstream 'B', Barangay 3, Siaton, Negros Oriental (Modified from San Jose, Siaton scope) Research notesDPWH project ID (no-id, eval 2017), License 21962, status On-going, CPES visit/final 89.30%/. | Siaton DPWH Negros Oriental 3rd DEO | 2017 | 46,107,000.00 | Philsouth Builders | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| REG-044 | C | Road Upgrading (Gravel to Paved), Metro Dumaguete (earlier segment, 2013 evaluation) Research notesDPWH project ID (no-id, eval 2013), License 21962, status On-going, CPES visit/final 87.60%/. | Dumaguete City DPWH (Region VII) | 2013 | 45,570,000.00 | Philsouth Builders (Formerly: Lotiff Construction) | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| BGov-23HL0082 | C | CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES: CONSTRUCTION OF CAYAOCAO - BUSAY ROAD Research notesProject ID 23HL0082. Status: Completed. Amount paid: 0.00. Start 2023-07-17 → Completion 2024-02-23. Coords 9.4892588,122.9287104. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 02/23/2024. | DPWH NegOr 3rd DEO area Negros Oriental 3rd DEO | 2023 | 45,311,559.03 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HK0066 | C | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS @ METRO DUMAGUETE DIVERSION ROAD, PACKAGE 1, NEGROS ORIENTAL Research notesProject ID 20HK0066. Status: Completed. Amount paid: 0.00. Start 2020-02-19 → Completion 2022-04-04. Coords 9.2805163,123.2762721. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 04/04/2022. | Dumaguete City Negros Oriental 2nd DEO | 2020 | 44,438,818.50 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-23HK0075 | C | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE - PRIMARY ROADS: DUMAGUETE NORTH RD (DUMAGUETE-JCT BAIS KABANKALAN) - K0003+972-K0005+089; K0005+100-K0005+890, SIBULAN, NEGROS ORI Research notesProject ID 23HK0075. Status: Completed. Amount paid: 0.00. Start 2023-04-14 → Completion 2023-09-26. Coords 9.3457521,123.2875615. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 09/26/2023. | Bais City Negros Oriental 2nd DEO | 2023 | 44,425,360.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18HL0044 | C | BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES: MASAPLOD BR. (B00003NR) ALONG DUMAGUETE SOUTH ROAD , DAUIN, NEGROS ORIENTAL Research notesProject ID 18HL0044. Status: Completed. Amount paid: 0.00. Start 2018-02-08 → Completion 2018-12-28. Coords 9.1762082,123.2515711. Program: Regular Infra. | Dumaguete City Negros Oriental 3rd DEO | 2018 | 44,100,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-21HL0019 | C | BRIDGE - WIDENING OF PERMANENT BRIDGES: WIDENING OF BRIDGE - GUINSUAN BRIDGE (B00010NR) ALONG DUMAGUETE SOUTH ROAD, ZAMBOANGUITA, NEGROS ORIENTAL Research notesProject ID 21HL0019. Status: Completed. Amount paid: 0.00. Start 2021-02-24 → Completion 2022-06-05. Coords 9.1106275,123.2028628. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 06/05/2022. | Dumaguete City Negros Oriental 3rd DEO | 2021 | 44,100,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-17HL0099 | C | WIDENING OF PERMANENT BRIDGES: JAGOBAAC BRIDGE (B00004NR) ALONG DSR, DAUIN. NEGROS ORIENTAL Research notesProject ID 17HL0099. Status: Completed. Amount paid: 0.00. Start 2018-02-08 → Completion 2018-12-15. Coords 9.1741724,123.2498462. Program: Regular Infra. | Dauin Negros Oriental 3rd DEO | 2018 | 44,100,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-21HK0051 | C | LOCAL INFRASTRUCTURE PROGRAM: LOCAL ROADS AND BRIDGES-LOCAL ROADS: CONCRETING OF ROAD, MABINAY, NEGROS ORIENTAL Research notesProject ID 21HK0051. Status: Completed. Amount paid: 0.00. Start 2021-02-11 → Completion 2021-12-26. Coords 9.6469933,122.9146683. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/26/2021. | Mabinay Negros Oriental 2nd DEO | 2021 | 43,421,282.28 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-19HJ0097 | C | CONSTRUCTION OF ONE (1) UNIT FOUR (4) STOREY 16 CLASSROOM BUILDING AT LA LIBERTAD CES, LA LIBERTAD, NEGROS ORIENTAL Research notesProject ID 19HJ0097. Status: Completed. Amount paid: 0.00. Start 2019-09-04 → Completion 2020-12-27. Coords 10.0270847,123.2340964. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/27/2020. | La Libertad Negros Oriental 1st DEO | 2019 | 43,295,192.55 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-24HK0069 | C | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS-DUMAGUETE NORTH ROAD-K0000+308-K0001+810, DUMAGUETE CITY, NEGROS ORIENTAL Research notesProject ID 24HK0069. Status: Completed. Amount paid: 0.00. Start 2024-02-27 → Completion 2024-06-03. Coords 9.3160179,123.3022642. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 06/03/2024. | Dumaguete City Negros Oriental 2nd DEO | 2024 | 42,999,460.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-17RG0043 | C | IMPROVEMENT/WIDENING OF NATIONAL ROADS-TERTIARY ROADS AT DUMAGUETE CITY-VALENCIA-BACONG ROAD INCLUDI Research notesProject ID 17RG0043. Status: Completed. Amount paid: 0.00. Start 2017-06-23 → Completion 2020-03-01. Coords 9.2906238,123.2680041. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 03/01/2020. | Dumaguete City Negros Oriental 2nd DEO | 2017 | 42,952,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-16HK0033 | C | CONSTRUCTION OF 2 UNITS, 4 STY. 12-CL AT MABINAY NATIONAL HIGH SCHOOL, MABINAY, NEG. OR. Research notesProject ID 16HK0033. Status: Completed. Amount paid: 0.00. Start 2016-06-22 → Completion 2017-09-01. Coords 9.722056,122.935278. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 09/01/2017. | Mabinay Negros Oriental 2nd DEO | 2016 | 42,627,224.91 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-22HL0003 | C | ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE- PRIMARY ROADS - DUMAGUETE SOUTH ROAD - K0061 + 828 - K0063 + 424, SIATON, NEGROS ORIENTAL Research notesProject ID 22HL0003. Status: Completed. Amount paid: 0.00. Start 2022-02-14 → Completion 2022-05-24. Coords 9.0862569,122.9359414. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 05/24/2022. | Dumaguete City Negros Oriental 3rd DEO | 2022 | 42,294,840.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-24HK0071 | C | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-BAYAWAN-MABINAY ROAD-K0144+000-K0145+036, K0146+801-K0147+780, MABINAY, NEGROS ORIENTAL Research notesProject ID 24HK0071. Status: Completed. Amount paid: 0.00. Start 2024-02-27 → Completion 2024-06-02. Coords 9.6234903,122.9109031. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 06/02/2024. | Bayawan City Negros Oriental 2nd DEO | 2024 | 42,286,020.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18HK0018 | C | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM, PRIMARY ROADS: DUMAGUETE NORTH ROAD (DUMAGUETE-JCT BAIS-KABANKALAN) INCLUDING ROW-K0026+700-K0027+555, NEGROS ORIENTAL Research notesProject ID 18HK0018. Status: Completed. Amount paid: 0.00. Start 2018-05-19 → Completion 2019-07-15. Coords 9.5012217,123.1686883. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 07/15/2019. | Bais City Negros Oriental 2nd DEO | 2018 | 42,100,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-24HK0067 | C | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS-BAIS-KABANKALAN ROAD- K0067+277-K0069+000, MABINAY, NEGROS ORIENTAL Research notesProject ID 24HK0067. Status: Completed. Amount paid: 0.00. Start 2024-02-27 → Completion 2024-06-01. Coords 9.6274722,123.0128144. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 06/01/2024. | Bais City Negros Oriental 2nd DEO | 2024 | 41,086,500.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-24HL0039 | C | CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES: CONSTRUCTION OF CAYAOCAO - BUSAY ROA Research notesProject ID 24HL0039. Status: Completed. Amount paid: 0.00. Start 2024-03-02 → Completion 2024-07-12. Coords 9.483525,122.9253472. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 07/12/2024. | DPWH NegOr 3rd DEO area Negros Oriental 3rd DEO | 2024 | 39,200,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-22HJ0069 | C | ASSET PRESERVATION PROGRAM -PREVENTIVE MAINTENANCE TERTIARY ROADS- K0100 + (-200) - K0100+346, K0109+715-K0109+967, K0120+848-K0121+055, K0129+650-K0130+235, AYUNGON. NEGROS ORIENTAL Research notesProject ID 22HJ0069. Status: Completed. Amount paid: 0.00. Start 2022-03-30 → Completion 2022-07-12. Coords 9.8807397,123.0958869. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 07/12/2022. | Ayungon Negros Oriental 1st DEO | 2022 | 39,200,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-21HK0057 | C | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS @ METRO DUMAGUETE DIVERSION ROAD PACKAGE 3, NEGROS ORIENTAL Research notesProject ID 21HK0057. Status: Completed. Amount paid: 0.00. Start 2021-02-11 → Completion 2023-03-10. Coords 9.2931861,123.2758606. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 03/10/2023. | Dumaguete City Negros Oriental 2nd DEO | 2021 | 38,600,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-23HK0127 | C | CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF RIVER CONTROL AT BALABNUGAN, SIBULAN, NEGROS ORIENTAL Research notesProject ID 23HK0127. Status: Completed. Amount paid: 0.00. Start 2023-12-04 → Completion 2024-07-01. Coords 9.3338173,123.2671752. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 07/01/2024. | Sibulan Negros Oriental 2nd DEO | 2023 | 38,575,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-19HL0108 | C | CONSTRUCTION OF 4 STY, 6 LAB SCHOOL BUILDING (2 REG WORKSHOP, 2 SCI-LAB, 2 ICT, 4CL) @ PULANGBATO NATIONAL SENIOR HIGH SCHOOL, VALENCIA (LUZURRIAGA) ,NEGROS ORIENTAL Research notesProject ID 19HL0108. Status: Completed. Amount paid: 0.00. Start 2019-10-01 → Completion 2020-10-16. Coords 9.3151269,123.2469361. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 10/16/2020. | Valencia Negros Oriental 3rd DEO | 2019 | 38,451,932.96 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-24HJ0128 | C | CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF CONCRETE ROAD-JCT. VALLEHERMOS Research notesProject ID 24HJ0128. Status: Completed. Amount paid: 0.00. Start 2025-03-26 → Completion 2025-08-10. Coords 10.3268722,123.2119278. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 08/10/2025. | DPWH NegOr 1st DEO area Negros Oriental 1st DEO | 2024 | 38,403,141.40 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-020 | C | Bridge Program: Widening of Permanent Bridges - Calo Br. (B00076NR) along Dumaguete North Road (Dumaguete-Jct. Bais-Kabankalan) Research notesDPWH project ID 23HK0116, License 21962 / 24525 / JV-23-10245, status On-going, CPES visit/final 94.30%/. | Dumaguete City DPWH | 2023 | 38,307,000.00 | PHILSOUTH BUILDERS INC. (Formerly: Lotiff Construction) / Richfield Builders, Inc. (JV) | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| BGov-22HL0018 | C | ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS- PRIMARY ROADS: DUMAGUETE SOUTH RD - K0027 + 000 - K0029 + 000, ZAMBOANGUI Research notesProject ID 22HL0018. Status: Completed. Amount paid: 0.00. Start 2022-02-14 → Completion 2022-12-18. Coords 9.1057361,123.2025139. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/18/2022. | Dumaguete City Negros Oriental 3rd DEO | 2022 | 37,803,019.90 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-21HL0005 | C | 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS: PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DUMAGUETE SOUTH ROAD - K0019 + 387 - K0020 + 000, K0020 + 533 - K0020+727, K0022 + 000- K00 Research notesProject ID 21HL0005. Status: Completed. Amount paid: 0.00. Start 2021-02-19 → Completion 2021-05-23. Coords 9.1633367,123.2431122. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 05/23/2021. | Dumaguete City Negros Oriental 3rd DEO | 2021 | 37,753,520.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-23HK0098 | C | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, WIDENING OF PERMANENT BRIDGES, AJONG BR. (B00075NR) ALONG DUMAGUETE NORTH ROAD (DUMAGUETE-JCT BAIS-KABANKALAN), SIBULAN, NEGROS ORIENTAL Research notesProject ID 23HK0098. Status: Completed. Amount paid: 0.00. Start 2023-04-05 → Completion 2024-05-16. Coords 9.37831,123.2609973. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 05/16/2024. | Bais City Negros Oriental 2nd DEO | 2023 | 37,730,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) / TRINITYCAD CORPORATION (FORMERLY:TRINITY CONSTRUCTION AND DEVELOPMENT) (27755) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-24HJ0049 | C | ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDARY ROADS VALLEHERMOSO-CANLAON CITY-LA CASTELLANA RD-K0160+500-K0160+627,K0160+834-K0161+000, K0161+889-K0162+000, K0164+700-K0166+487, VALLEHERMOSO, NEGROS ORIENTAL Research notesProject ID 24HJ0049. Status: Completed. Amount paid: 0.00. Start 2024-03-07 → Completion 2024-09-06. Coords 10.370015,123.2785517. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 09/06/2024. | Canlaon City Negros Oriental 1st DEO | 2024 | 37,571,909.68 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-15HL0120 | C | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AAND DRAINAGE . . CANAWAY RIVER CONTROL, SIA Research notesProject ID 15HL0120. Status: Completed. Amount paid: 0.00. Start 2016-03-09 → Completion 2016-11-23. Coords None,None. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 11/23/2016. | DPWH NegOr 3rd DEO area Negros Oriental 3rd DEO | 2016 | 37,239,680.50 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-17HL0020 | C | NETWORK DEV.T-OFF CARRIAGEAY IMPV'T. INCL: DRAINAGE: DGTE.CITY-VALENCIA-BACONG RD, K0009+451-K0010+1 Research notesProject ID 17HL0020. Status: Completed. Amount paid: 0.00. Start 2017-04-16 → Completion 2018-02-05. Coords 9.2791699,123.2468285. Program: Regular Infra. | Bacong Negros Oriental 3rd DEO | 2017 | 36,012,060.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-049 | C | Org Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program: Construction/Maintenance of Flood Mitigation Structures, Reconstruction/Rehabilitation of Ocoy River Control Research notesDPWH project ID (no-id, eval 2019), License 21962, status Completed, CPES visit/final /93.00%. | Negros Oriental (province-wide) DPWH | 2019 | 34,300,000.00 | Philsouth Builders (Formerly: Lotiff Construction) | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| BGov-22HK0046 | C | SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) : ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REPLACEMENT OF PCDG BRIDGE AT SITIO CAMBAGROY, BARANGAY II, BAIS CITY, NEG. OR. Research notesProject ID 22HK0046. Status: Completed. Amount paid: 0.00. Start 2022-06-06 → Completion 2023-03-15. Coords 9.5930056,123.1290972. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 03/15/2023. | Bais City Negros Oriental 2nd DEO | 2022 | 34,300,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HL0035 | C | NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING - PRIMARY ROADS : DUMAGUETE SOUTH RD - K0007 + 188 - K0008 + 000, BACONG, NEGROS ORIENTAL Research notesProject ID 20HL0035. Status: Completed. Amount paid: 0.00. Start 2020-12-08 → Completion 2021-11-12. Coords 9.2501639,123.2954028. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 11/12/2021. | Dumaguete City Negros Oriental 3rd DEO | 2020 | 34,300,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-19HK0020 | C | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- RECONSTRUCTION/REHAB. OF OCOY RIVER CONTROL, MAGATAS, SIBULAN, NEGROS ORIENTAL Research notesProject ID 19HK0020. Status: Completed. Amount paid: 0.00. Start 2019-06-04 → Completion 2020-01-26. Coords 9.3394962,123.2698683. Program: Regular Infra. Sumbong sa Pangulo lists completion 12/14/2022; cost reported PHP 67,550,000.00. DPWH official transparency portal confirms accomplishment 100% as of 01/26/2020. | Sibulan Negros Oriental 2nd DEO | 2019 | 34,300,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18HK0003 | C | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRA Research notesProject ID 18HK0003. Status: Completed. Amount paid: 0.00. Start 2018-05-25 → Completion 2018-12-24. Coords 9.3214817,123.258675. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/24/2018. | DPWH NegOr 2nd DEO area Negros Oriental 2nd DEO | 2018 | 34,299,953.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18HK0004 | C | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRA Research notesProject ID 18HK0004. Status: Completed. Amount paid: 0.00. Start 2018-04-25 → Completion 2019-04-15. Coords 9.3466856,123.2722038. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 04/15/2019. | DPWH NegOr 2nd DEO area Negros Oriental 2nd DEO | 2018 | 34,299,933.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-25HK0053 | C | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE-PRIMARY ROADS ALONG DUMAGUETE SOUTH RD-K0001+270-K0002+470 Research notesProject ID 25HK0053. Status: On-Going. Amount paid: 0.00. Start 2025-03-21 → Completion None. Coords 9.3049365,123.3077455. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 79.7% as of —. | Dumaguete City Negros Oriental 2nd DEO | 2025 | 34,258,732.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HJ0067 | C | NATIONAL BUILDING PROGRAM - BUILDING AND OTHER STRUCTURES - CONSTRUCTION (COMPLETION) OF TWO-STOREY DPWH NEGROS ORIENTAL 1ST DISTRICT ENGINEERING OFFICE BUILDING, GUARD HOUSE AND CONSTRUCTION OF MULTI-PURPOSE COVERED COURT, TINAOGAN, BINDOY, NEGROS ORIENT Research notesProject ID 20HJ0067. Status: Completed. Amount paid: 0.00. Start 2020-09-02 → Completion 2021-09-26. Coords 9.7764867,123.1447217. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 09/26/2021. | Bindoy Negros Oriental 1st DEO | 2020 | 33,913,880.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-16HL0066 | C | CONSTRUCTION OF 1 UNIT 4 STY 20CL @ DAWIS NATIONAL HIGH SCHOOL, BAYAWAN CITY, NEGROS ORIENTAL Research notesProject ID 16HL0066. Status: Completed. Amount paid: 0.00. Start 2016-09-26 → Completion 2018-01-09. Coords 9.569719,122.880964. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 01/09/2018. | Bayawan City Negros Oriental 3rd DEO | 2016 | 33,389,762.48 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HK0063 | C | ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS @ BAIS-KABANKALAN ROAD K0053+823-K0054+020, K0062+500-K0062+600, K0070+280-K0070+807, NEGROS ORIENTAL Research notesProject ID 20HK0063. Status: Completed. Amount paid: 0.00. Start 2020-12-02 → Completion 2021-12-13. Coords 9.6103855,123.0365044. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/13/2021. | Bais City Negros Oriental 2nd DEO | 2020 | 32,585,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-23HJ0013 | C | ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES MANJUYOD BR. (B00286NR) ALONG DUMAGUETE NORTH RD. (JCT BAIS-KABANKALAN-NEGROS OCC BDRY), MANJUYOD, NEGROS ORIENTAL Research notesProject ID 23HJ0013. Status: Completed. Amount paid: 0.00. Start 2023-02-03 → Completion 2024-06-30. Coords 9.6688232,123.1435776. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 06/30/2024. | Bais City Negros Oriental 1st DEO | 2023 | 31,948,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-048 | C | Network Development Program: Construction of By-Pass and Diversion Roads - Metro Dumaguete Diversion Road (earlier 2019 evaluation; predecessor to 24HK0073) Research notesDPWH project ID (no-id, eval 2019), License 21962, status On-going, CPES visit/final 90.70%/. | Dumaguete City DPWH | 2019 | 31,210,000.00 | Philsouth Builders (Formerly: Lotiff Construction) | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| BGov-18HK0020 | C | NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-METRO DUMAGUETE DIVERSION ROAD(SECTION 1), NEGROS ORIENTAL Research notesProject ID 18HK0020. Status: Completed. Amount paid: 0.00. Start 2018-05-25 → Completion 2020-09-30. Coords 9.3154433,123.2772417. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 09/30/2020. | Dumaguete City Negros Oriental 2nd DEO | 2018 | 31,209,997.12 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-027 | B | Construction of bridge near BIR linking Brgy Bagacay/Junob to Brgy Batinguel Research notesStatement attributed to Mayor 'Ipe' Remollo describing the project and contractor. NOA/NTP/contract not located on dumaguetecity.gov.ph for this specific bridge in this pass. Possible separate City Engineer's Office record exists. | Dumaguete City City Government of Dumaguete | 2020 | 31,000,000.00 | PhilSouth Builders (LGU statement only; no NOA located) | Official LGU public statement (no NOA located in this pass) | View |
| BGov-16HL0067 | C | CONSTRUCTION OF 1 UNIT 4 STY 20CL @ BAYAWAN NATIONAL HIGH SCHOOL, BAYAWAN CITY, NEGROS ORIENTAL Research notesProject ID 16HL0067. Status: Completed. Amount paid: 0.00. Start 2016-09-26 → Completion 2018-01-19. Coords 9.360179,122.812843. Program: Outside Infra. | Bayawan City Negros Oriental 3rd DEO | 2016 | 30,631,856.14 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-17RG0056 | C | CONSTRUCTION OF FOUR (4) STOREY TWENTY (20) CLASSROOM SCHOOL BUILDING AT NEGROS ORIENTAL HIGH SCHOOL Research notesProject ID 17RG0056. Status: Completed. Amount paid: 0.00. Start 2017-08-31 → Completion 2018-12-10. Coords 9.314768,123.3027459. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/10/2018. | DPWH NegOr 2nd DEO area Negros Oriental 2nd DEO | 2016 | 30,353,075.14 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-19HJ0033 | C | REPLACEMENT OF DPWH BUILDING, NEGROS ORIENTAL 1ST DISTRICT ENGINEERING OFFICE, TINAOGAN, BINDOY, NEGROS ORIENTAL Research notesProject ID 19HJ0033. Status: Completed. Amount paid: 0.00. Start 2019-06-19 → Completion 2020-11-01. Coords 9.7768483,123.1450008. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 11/01/2020. | Bindoy Negros Oriental 1st DEO | 2019 | 29,915,593.99 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-24HK0066 | C | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - BAIS-KABANKALAN ROAD K0061+796 - K0063+093, MABINAY, NEGROS ORIENTAL Research notesProject ID 24HK0066. Status: Completed. Amount paid: 0.00. Start 2024-02-27 → Completion 2024-05-14. Coords 9.6136958,123.0399767. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 05/14/2024. | Bais City Negros Oriental 2nd DEO | 2024 | 29,773,380.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18HL0061 | C | NETWORK DEVELOPMENT - ROAD WIDENING, TERTIARY ROADS: DUMAGUETE CITY-VALENCIA-BACONG ROAD - K0009+134.80 - K0010+144.80, VALENCIA, NEGROS ORIENTAL Research notesProject ID 18HL0061. Status: Completed. Amount paid: 0.00. Start 2018-03-25 → Completion 2020-11-17. Coords 9.2444258,123.2854264. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 11/17/2020. | Dumaguete City Negros Oriental 3rd DEO | 2018 | 29,723,400.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-026 | C | Bridge Program: Widening of Permanent Bridges - Ocoy Br. (B00074NR) along Dumaguete North Rd (Dumaguete-Jct. Bais-Kabankalan) Research notesDPWH project ID 24HK0074, License 21962 / 24556 / JV-24-13477, status On-going, CPES visit/final 96.70%/. | Dumaguete City DPWH | 2024 | 29,400,000.00 | PHILSOUTH BUILDERS INC. (Formerly: Lotiff Construction) / R.E. Singson Construction (JV) | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| BGov-18HL0058 | C | CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF CANAWAY RIVER CONTROL ABUTMENT A SIDE: STA. 0+700 - STA. 1+400 ABUTMENT B SIDE, SIATON, NEGROS ORIENTAL Research notesProject ID 18HL0058. Status: Completed. Amount paid: 0.00. Start 2018-03-25 → Completion 2018-12-07. Coords 9.0524875,123.0382945. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/07/2018. | Siaton Negros Oriental 3rd DEO | 2018 | 29,400,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-22HL0006 | C | ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS: DUMAGUETE SOUTH RD - K0008 + 000 - K0009 + 500, BACONG, NEG Research notesProject ID 22HL0006. Status: Completed. Amount paid: 0.00. Start 2022-02-14 → Completion 2023-10-10. Coords 9.251525,123.295075. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 10/10/2023. | Dumaguete City Negros Oriental 3rd DEO | 2022 | 29,400,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HK0056 | C | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING- TERTIARY ROADS @ DUMAGUETE CITY-VALENCIA-BACONG ROAD K0005+870-K0006+410, DUMAGUETE CITY Research notesProject ID 20HK0056. Status: Completed. Amount paid: 0.00. Start 2020-10-08 → Completion 2021-12-28. Coords 9.2922385,123.2725445. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/28/2021. | Dumaguete City Negros Oriental 2nd DEO | 2020 | 29,400,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-17HL0022 | C | CONST./MAINT. OF BRIDGES ALONG NAT'L. RDS-WIDENING OF PERM.BRIDGES -MAINIT BRIDGE ALONG DSR, DAUIN Research notesProject ID 17HL0022. Status: Completed. Amount paid: 0.00. Start 2017-06-25 → Completion 2018-10-31. Coords 9.2145825,123.2811586. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 10/31/2018. | Dauin Negros Oriental 3rd DEO | 2017 | 29,400,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-16HK0122 | C | CONSTRUCTION OF OCOY RIVER CONTROL, LOOC, SIBULAN Research notesProject ID 16HK0122. Status: Completed. Amount paid: 0.00. Start 2017-03-28 → Completion 2018-07-01. Coords 9.356779,123.273507. Program: Regular Infra. Sumbong sa Pangulo lists completion 10/31/2022; cost reported PHP 93,605,000.00. | Sibulan Negros Oriental 2nd DEO | 2017 | 29,400,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-23HL0021 | C | ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: CONSTRUCTION / UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS: DUMAGUETE SOUTH RD - K0009 + 500 - K0010 + 670, K0010 +678 Research notesProject ID 23HL0021. Status: Completed. Amount paid: 0.00. Start 2023-02-20 → Completion 2023-11-03. Coords 9.2254556,123.2857278. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 11/03/2023. | Dumaguete City Negros Oriental 3rd DEO | 2023 | 29,243,200.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-15HL0131 | C | NETWORK DEVELOPMENT-IMPV'T./WIDENING OF NAT'L. ROADS:DGTE. CITY-VALENCIA-BACONG ROAD- K0008+467.80- Research notesProject ID 15HL0131. Status: Completed. Amount paid: 0.00. Start 2016-03-29 → Completion 2016-11-16. Coords 9.2847553,123.2503671. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 11/16/2016. | Bacong Negros Oriental 3rd DEO | 2016 | 29,239,675.07 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18HK0140 | C | CONSTRUCTION OF DRAINAGE ALONG DUMAGUETE CIRCUMFERENTIAL ROAD, BRGY. CANTIL-E, DUMAGUETE CITY, NEGROS ORIENTAL Research notesProject ID 18HK0140. Status: Completed. Amount paid: 0.00. Start 2019-01-03 → Completion 2020-01-02. Coords 9.2848597,123.2738523. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 01/02/2020. | Dumaguete City Negros Oriental 2nd DEO | 2018 | 28,950,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-17RG0015 | C | CONSTRUCTION OF 2-UNITS FOUR (4) STOREY EIGHT (8) CLASSROOM SCHOOL BUILDING AT BAIS NATIONAL HIGH SCHOOL, BAIS CITY Research notesProject ID 17RG0015. Status: Completed. Amount paid: 0.00. Start 2017-09-04 → Completion 2018-12-10. Coords 9.5934615,123.1176083. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/10/2018. | Bais City Negros Oriental 2nd DEO | 2016 | 28,945,269.84 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-17RG0017 | C | CONSTRUCTION OF FOUR (4) STOREY SIXTEEN (16) CLASSROOM SCHOOL BUILDING AT BAIS CITY NATIONAL HIGH SCHOOL, BAIS CITY Research notesProject ID 17RG0017. Status: Completed. Amount paid: 0.00. Start 2017-09-04 → Completion 2018-12-10. Coords 9.5935433,123.1179378. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/10/2018. | Bais City Negros Oriental 2nd DEO | 2016 | 28,863,009.55 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-15HL0122 | C | NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASSES/DIVERSION ROADS INCLUDING ROW PAYMENT: METRO DUMAGUETE Research notesProject ID 15HL0122. Status: Completed. Amount paid: 0.00. Start 2016-06-13 → Completion 2017-02-06. Coords 9.270888,123.274989. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 02/06/2017. | Dumaguete City Negros Oriental 3rd DEO | 2016 | 28,733,954.28 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-16R00033 | C | REHABILITATION/MAJOR REPAIR OF SIATON BR (B00018NR) ALONG DUMAGUETE SOUTH ROAD Research notesProject ID 16R00033. Status: Completed. Amount paid: 0.00. Start 2016-03-30 → Completion 2016-11-18. Coords 9.0593762,123.0273741. Program: Regular Infra. | Dumaguete City Region VII | 2016 | 28,339,117.95 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-16HL0035 | C | WIDENING OF DUMAGUETE SOUTH ROAD PHASE II (THIRD ENGINEERING DISTRICT), MUNICIPALITY OF BACONG, NEGR Research notesProject ID 16HL0035. Status: Completed. Amount paid: 0.00. Start 2016-04-07 → Completion 2016-11-25. Coords 9.236316,123.290619. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 11/25/2016. | Dumaguete City Negros Oriental 3rd DEO | 2016 | 28,214,112.99 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-16R00051 | C | REHABILITATION/MAJOR REPAIR OF CANAWAY BR (B00017NR) ALONG DUMAGUETE SOUTH ROAD Research notesProject ID 16R00051. Status: Completed. Amount paid: 0.00. Start 2016-03-30 → Completion 2016-11-18. Coords 9.0638855,123.0449077. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 11/18/2016. | Dumaguete City Region VII | 2016 | 28,068,151.97 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| DPWH-18HF0104 | C | CONSTRUCTION/IMPROVEMENT OF BRGY. MANGOTO-SAMBAGON-BUSAY ROAD LEADING TO BUSAGAK FALLS, MANGOTO, PINAMUNGAJAN, CEBU Research notesDPWH transparency portal — direct row. Project ID 18HF0104. Implementing office Cebu 3rd DEO. Accomplishment 100%. Completion target 01/17/2019. | Negros Oriental Cebu 3rd DEO | 2018 | 27,882,294.03 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | DPWH official transparency portal (transparency.dpwh.gov.ph) — direct DPWH project register | View |
| BGov-23HK0119 | C | ORGANIZATION OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING - PRIMARY ROADS - DUMAGUETE NORTH ROAD (DUMAGUETE - JCT BAIS-KABANKALAN) K0020+459-K0021+000, AMLAN, NEGROS ORIENTAL Research notesProject ID 23HK0119. Status: On-Going. Amount paid: 0.00. Start 2023-04-14 → Completion None. Coords 9.464255,123.22475. Program: Regular Infra. | Bais City Negros Oriental 2nd DEO | 2023 | 27,832,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-023 | C | Asset Preservation Program - Preventive Maintenance, Secondary Roads: Vallehermoso-Canlaon City-La Castellana Rd K0156+000-K0157+000, K0157+378-K0158+000 Research notesDPWH project ID 24HJ0042, License 21962, status Completed, CPES visit/final /93.50%. | Canlaon City DPWH | 2024 | 27,729,100.00 | PHILSOUTH BUILDERS INC. (Formerly: Lotiff Construction) | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| BGov-22HK0081 | C | CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER RA 11239: PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) ALONG BAIS - KABANKALAN RD - K0057+623 - K0059+135, BAIS CITY, NEGROS ORIENTAL Research notesProject ID 22HK0081. Status: Completed. Amount paid: 0.00. Start 2022-07-29 → Completion 2022-12-05. Coords 9.6188317,123.0617114. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/05/2022. | Bais City Negros Oriental 2nd DEO | 2022 | 27,402,760.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-16HL0065 | C | CONSTRUCTION OF 1 UNIT 4 STY 16CL @ BAYAWAN NATIONAL HIGH SCVHOOL, BAYAWAN CITY, NEGROS ORIENTAL Research notesProject ID 16HL0065. Status: Completed. Amount paid: 0.00. Start 2016-09-26 → Completion 2018-01-18. Coords 9.360724,122.813393. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 01/18/2018. | Bayawan City Negros Oriental 3rd DEO | 2016 | 26,275,444.15 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-22HK0071 | C | CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER RA 11239: PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) MAYOR RAMON T. PASTOR SR. ST. CHAINAGE 0 - CHAINAGE 1283, DUMAGUETE CITY, NEGROS ORIENTAL Research notesProject ID 22HK0071. Status: Completed. Amount paid: 0.00. Start 2022-03-24 → Completion 2022-07-20. Coords 9.310071,123.3053519. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 07/20/2022. | Dumaguete City Negros Oriental 2nd DEO | 2022 | 25,794,580.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-22HL0002 | C | ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE - PRIMARY ROADS - DUMAGUETE SOUTH ROAD - K0044 + 285 - K0045 + 960, SIATON, NEGROS ORIENTAL Research notesProject ID 22HL0002. Status: Completed. Amount paid: 0.00. Start 2022-02-14 → Completion 2022-05-05. Coords 9.0773694,123.074345. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 05/05/2022. | Dumaguete City Negros Oriental 3rd DEO | 2022 | 25,480,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-22HJ0055 | C | BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES ALANGILANAN BR. (B00060NR) ALONG DUMAGUETE NORTH RD. (JCT BAIS-KABANKALAN-NEGROS OCC BDRY), MANJUYOD, NEGROS ORIENTAL Research notesProject ID 22HJ0055. Status: Completed. Amount paid: 0.00. Start 2022-02-08 → Completion 2022-11-06. Coords 9.645271,123.10628. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 11/06/2022. | Bais City Negros Oriental 1st DEO | 2022 | 25,088,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-22HK0053 | C | CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239: PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) ALONG BAIS-KABANKALAN RD - K0052+200 - K0054+000, BAIS CITY, NEGROS ORIENTAL Research notesProject ID 22HK0053. Status: Completed. Amount paid: 0.00. Start 2022-03-24 → Completion 2022-06-13. Coords 9.6318022,123.0824725. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 06/13/2022. | Bais City Negros Oriental 2nd DEO | 2022 | 24,831,240.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18HK0168 | C | CONSTRUCTION OF 3-STOREY 9-CLASSROOM SCHOOL BUILDING AT WEST CITY ES, DUMAGUETE CITY,NEGROS ORIENTAL Research notesProject ID 18HK0168. Status: Completed. Amount paid: 0.00. Start 2019-01-09 → Completion 2020-11-03. Coords 9.3093745,123.304187. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 11/03/2020. | Dumaguete City Negros Oriental 2nd DEO | 2018 | 24,531,031.09 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HL0037 | C | CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER CONTROL ALONG BANICA RIVER UPSTREAM A & DOWNSTREAM A, VALENCIA, NEGROS ORIENTAL Research notesProject ID 20HL0037. Status: Completed. Amount paid: 0.00. Start 2020-03-06 → Completion 2020-12-02. Coords 9.3112733,123.2544317. Program: Regular Infra. Sumbong sa Pangulo lists completion 02/14/2023; cost reported PHP 49,000,000.00. DPWH official transparency portal confirms accomplishment 100% as of 12/02/2020. | Valencia Negros Oriental 3rd DEO | 2020 | 24,500,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-25HL0029 | C | CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF ROAD, BARANGAY INALAD Research notesProject ID 25HL0029. Status: On-Going. Amount paid: 0.00. Start 2025-02-19 → Completion None. Coords 9.0743369,123.0595931. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 09/30/2025. | DPWH NegOr 3rd DEO area Negros Oriental 3rd DEO | 2025 | 24,255,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| DPWH-20HM0069 | C | 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE/SHORE PROTECTION AT HELEN, LARENA, SIQUIJORFlood Control and Drainage Research notesDPWH transparency portal — direct row. Project ID 20HM0069. Implementing office Siquijor DEO. Accomplishment 100%. Completion target 10/08/2021. | Negros Oriental Siquijor DEO | 2020 | 24,181,532.51 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | DPWH official transparency portal (transparency.dpwh.gov.ph) — direct DPWH project register | View |
| BGov-16HK0065 | C | CONSTRUCTION OF 2-UNITS, TWO (2) STOREY EIGHT (8) CLASSROOM SCHOOL BUILDING AT MAYAPOSI COMMUNITY HI Research notesProject ID 16HK0065. Status: Completed. Amount paid: 0.00. Start 2016-09-22 → Completion 2018-01-15. Coords 9.64262,123.0109617. Program: Outside Infra. | DPWH NegOr 2nd DEO area Negros Oriental 2nd DEO | 2016 | 23,653,215.42 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-038 | C | Bridge Program: Widening of Jilocon Bridge (Cantilevered) (B00080NR) along Dumaguete North Road (Dumaguete-Jct. Bais-Kabankalan) Research notesDPWH project ID 23HK0100, License 21962 / JV-23-10245, status On-going, CPES visit/final 98.00%/. | Dumaguete City DPWH | 2024 | 23,347,520.00 | PHILSOUTH BUILDERS INC. (Formerly: Lotiff Construction) / Richfield Builders, Inc. (JV) | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| BGov-15HL0123 | C | CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO. . . . CONCRTETING OF ROADS LEADING TO CASARORO Research notesProject ID 15HL0123. Status: Completed. Amount paid: 0.00. Start 2016-04-07 → Completion 2016-10-03. Coords 9.288574,123.238185. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 10/03/2016. | DPWH NegOr 3rd DEO area Negros Oriental 3rd DEO | 2016 | 23,274,999.61 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-24HK0075 | C | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, WIDENING OF PERMANENT BRIDGES, CALO BR. (B00076NR) ALONG DUMAGUETE NORTH ROAD (DUMAGUETE-JCT. BAIS-KABANKALAN), NEGROS ORIENTAL Research notesProject ID 24HK0075. Status: On-Going. Amount paid: 0.00. Start 2024-04-16 → Completion None. Coords 9.3852528,123.2579889. Program: Regular Infra. | Bais City Negros Oriental 2nd DEO | 2024 | 22,230,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) / RICHFIELD BUILDERS, INC. (FORMERLY: RICHFIELD BUILDERS) (24525) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-17RG0016 | C | CONSTRUCTION OF FOUR (4) STOREY TWELVE (12) CLASSROOM SCHOOL BUILDING AT BAIS CITY NATIONAL HIGH SCHOOL, BAIS CITY Research notesProject ID 17RG0016. Status: Completed. Amount paid: 0.00. Start 2017-09-04 → Completion 2018-12-10. Coords 9.5931728,123.1176927. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/10/2018. | Bais City Negros Oriental 2nd DEO | 2016 | 21,706,240.86 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-23HK0051 | C | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - METRO DUMAGUETE DIVERSION ROAD, NEGROS ORIENTAL Research notesProject ID 23HK0051. Status: On-Going. Amount paid: 0.00. Start 2023-02-06 → Completion None. Coords 9.3246445,123.2678818. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 49.5% as of —. | Dumaguete City Negros Oriental 2nd DEO | 2023 | 21,059,695.76 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-24HK0082 | C | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, WIDENING OF PERMANENT BRIDGES, TAPON NORTE BR. (B00079NR) ALONG DUMAGUETE NORTH RD (DUMAGUETE-JCT BAIS-KABANKALAN), NEGROS ORIENTAL Research notesProject ID 24HK0082. Status: On-Going. Amount paid: 0.00. Start 2024-04-16 → Completion None. Coords 9.4158472,123.2410278. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 48% as of —. | Bais City Negros Oriental 2nd DEO | 2024 | 20,963,403.91 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) / TRINITYCAD CORPORATION (FORMERLY:TRINITY CONSTRUCTION AND DEVELOPMENT) (27755) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HL0031 | C | FLOOD MANAGEMENT PROGRAM: CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PALINPINON RIVER CONTROL, VALENCIA, NEGROS ORIENTAL Research notesProject ID 20HL0031. Status: Completed. Amount paid: 0.00. Start 2020-02-17 → Completion 2021-03-12. Coords 9.3141067,123.2304153. Program: Regular Infra. Sumbong sa Pangulo lists completion 11/13/2022; cost reported PHP 49,000,000.00. DPWH official transparency portal confirms accomplishment 100% as of 03/12/2021. | Valencia Negros Oriental 3rd DEO | 2020 | 20,731,900.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18HJ0044 | C | ASSET PRESERVATION PROGRAM- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-TERTIARY ROADS ALONG MABINAY-AYUNGON ROAD, AYUNGON, NEGROS ORIENTAL 1ST LD Research notesProject ID 18HJ0044. Status: Completed. Amount paid: 0.00. Start 2018-05-06 → Completion 2019-03-31. Coords 9.7762598,123.1451585. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 03/31/2019. | Ayungon Negros Oriental 1st DEO | 2018 | 20,464,594.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-046 | C | Land Development of Banilad Plains View Housing Project 1 - Roads, Open Lined Canal, Electrical Distribution, Waterline, Brgy. Banilad Research notesDPWH project ID (NHA, 2021), License 21962, status Completed, CPES visit/final /91.33%. | Negros Oriental (province-wide) NHA | 2021 | 20,350,000.00 | Philsouth Builders (Formerly: Lotiff Construction) | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| BGov-24HK0068 | C | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - BAIS-KABANKALAN ROAD K0085+848 - K0086+301, MABINAY, NEGROS ORIENTAL Research notesProject ID 24HK0068. Status: Completed. Amount paid: 0.00. Start 2024-02-27 → Completion 2024-05-08. Coords 9.7234778,122.9302681. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 05/08/2024. | Bais City Negros Oriental 2nd DEO | 2024 | 20,109,600.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-25HK0066 | C | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-METRO DUMAGUETE DIVERSION ROAD, NEGROS ORIENTAL Research notesProject ID 25HK0066. Status: On-Going. Amount paid: 0.00. Start 2025-02-21 → Completion None. Coords 9.3251097,123.2672383. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 20.16% as of —. | Dumaguete City Negros Oriental 2nd DEO | 2025 | 19,863,872.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-16HL0046 | C | CONSTRUCTION OF MPB (PUBLIC MARKET), DAUIN, NEGROS ORIENTAL Research notesProject ID 16HL0046. Status: Completed. Amount paid: 0.00. Start 2016-07-13 → Completion 2017-05-04. Coords 9.19053,123.263831. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 05/04/2017. | Dauin Negros Oriental 3rd DEO | 2016 | 19,701,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HL0075 | C | ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS: DUMAGUETE SOUTH RD- K0020 + 727 - K0022 + 000, DAUIN, NEGROS ORIENTAL Research notesProject ID 20HL0075. Status: Completed. Amount paid: 0.00. Start 2020-04-21 → Completion 2020-07-03. Coords 9.1528128,123.2369536. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 07/03/2020. | Dumaguete City Negros Oriental 3rd DEO | 2020 | 19,600,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-22HK0047 | C | ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS METRO DUMAGUETE DIVERSION ROAD, NEGROS ORIENTAL Research notesProject ID 22HK0047. Status: Completed. Amount paid: 0.00. Start 2022-02-11 → Completion 2023-10-18. Coords 9.2916119,123.2762834. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 10/18/2023. | Dumaguete City Negros Oriental 2nd DEO | 2022 | 19,600,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-17HL0019 | C | CONST./MAINT. OF BRIDGES ALONG NAT'L. ROADS-WIDENING OF PERM. BRIDGE. . .SAN MIGUEL BRIDGE ALONG DS Research notesProject ID 17HL0019. Status: Completed. Amount paid: 0.00. Start 2017-06-25 → Completion 2018-06-30. Coords 9.2281791,123.2867918. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 06/30/2018. | DPWH NegOr 3rd DEO area Negros Oriental 3rd DEO | 2017 | 19,600,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-23HL0057 | C | CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF BALUGO BRIDGE, VALENCIA, Research notesProject ID 23HL0057. Status: Completed. Amount paid: 0.00. Start 2023-03-29 → Completion 2023-12-08. Coords 9.3074806,123.250175. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/08/2023. | Valencia Negros Oriental 3rd DEO | 2023 | 19,600,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-045 | C | Banilad Plains View Housing Project Phase 1 (NHA-implemented housing in Brgy. Banilad area) Research notesDPWH project ID (NHA project, 2019), License 21962, status On-going, CPES visit/final 88.45%/. | Negros Oriental (province-wide) NHA | 2019 | 19,488,000.00 | PhilSouth Builders | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| BGov-24HK0044 | C | CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - CONCRETING OF ACCESS ROAD LEADING TO BAHIA DE BAIS, DEWEY ISLAND, BAIS CITY, NEG.OR Research notesProject ID 24HK0044. Status: Completed. Amount paid: 0.00. Start 2024-02-27 → Completion 2024-06-11. Coords 9.5904628,123.1463458. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 06/11/2024. | Bais City Negros Oriental 2nd DEO | 2024 | 19,300,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-039 | C | Rehabilitation of Mainit Section, Tanjay-Dumaguete North Road, Km.34+000 - Km.35+000, Tanjay City, Negros Oriental Research notesDPWH project ID (no-id, eval 2011), License 21962, status On-going, CPES visit/final 86.00%/. | Dumaguete City DPWH (Region VII) | 2011 | 19,270,000.00 | Lotiff Construction | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| BGov-18HK0131 | C | CONSTRUCTION OF FOUR (4) STOREY TWO (2) SCIENCE LABORATORY & TWO (2) ICT LAB SCHOOL BUILDING AT BAIS CITY NATIONAL HIGH SCHOOL, BAIS CITY (9.50MX23.00M) Research notesProject ID 18HK0131. Status: Completed. Amount paid: 0.00. Start 2018-08-06 → Completion 2019-07-15. Coords 9.5938478,123.1182755. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 07/15/2019. | Bais City Negros Oriental 2nd DEO | 2018 | 18,997,219.38 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18HK0132 | C | CONSTRUCTION OF FOUR (4) STOREY TWO (2) SCIENCE LABORATORY & TWO (2) ICT LAB SCHOOL BUILDING AT BAIS CITY NATIONAL SCIENCE HIGH SCHOOL, BAIS CITY (9.50MX23.00M) Research notesProject ID 18HK0132. Status: Completed. Amount paid: 0.00. Start 2018-07-27 → Completion 2019-07-22. Coords 9.5878845,123.1217854. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 07/22/2019. | Bais City Negros Oriental 2nd DEO | 2018 | 18,997,219.38 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18HK0128 | C | CONSTRUCTION OF FOUR (4) STOREY TWO (2) SCIENCE LABORATORY & TWO (2) ICT LAB SCHOOL BUILDING AT TANJAY CITY SCIENCE HIGH SCHOOL, TANJAY CITY (9.50MX23.00M) Research notesProject ID 18HK0128. Status: Completed. Amount paid: 0.00. Start 2018-07-27 → Completion 2019-07-15. Coords 9.4354103,123.188913. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 07/15/2019. | Tanjay City Negros Oriental 2nd DEO | 2018 | 18,941,179.38 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-19HK0014 | C | ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE: TERTIARY ROADS, ASPHALT OVERLAY ALONG DUMAGUETE CITY- VALENCIA-BACONG ROAD - K0003+(-687)-K0003+012; K0004+313-K0004+532, NEGROS ORIENTAL Research notesProject ID 19HK0014. Status: Completed. Amount paid: 0.00. Start 2019-06-27 → Completion 2021-04-19. Coords 9.2996288,123.3028324. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 04/19/2021. | Dumaguete City Negros Oriental 2nd DEO | 2019 | 18,758,883.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-16R00071 | C | IMPROVEMENT/WIDENING OF NATIONAL ROADS - MAYOR RAMON T. PASTOR SR. ST. - CHAINAGE 716 - CHAINAGE 1283, NEGROS ORIENTAL Research notesProject ID 16R00071. Status: Completed. Amount paid: 0.00. Start 2016-10-18 → Completion 2021-10-20. Coords 9.303651,123.3057272. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 10/20/2021. | Negros Oriental Region VII | 2016 | 18,757,085.05 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-16HL0157 | C | CONST./IMPV'T. OF ACCESS ROAD LEADING TO CASARORO FALLS, VALENCIA, NEGROS ORIENTAL Research notesProject ID 16HL0157. Status: Completed. Amount paid: 0.00. Start 2017-03-13 → Completion 2017-09-01. Coords 9.2812349,123.207682. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 09/01/2017. | Valencia Negros Oriental 3rd DEO | 2017 | 18,600,400.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-16HK0011 | C | RECONSTRUCTION/REHABILITATION OF RIVER CONTROL, BANICA RIVER CONTROL (BAGACAY AND CADAWINONAN SECTIO Research notesProject ID 16HK0011. Status: Completed. Amount paid: 0.00. Start 2016-03-23 → Completion 2017-10-13. Coords 9.309167,123.275833. Program: Regular Infra. | DPWH NegOr 2nd DEO area Negros Oriental 2nd DEO | 2016 | 18,521,996.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-17HL0023 | C | CONST./REPAIR/REHAB./IMPV'T. OF VARIOUS INFRA INCLUDING LOCAL PROJ.: HABHABAN CAVE, BAYAWAN CITY Research notesProject ID 17HL0023. Status: Completed. Amount paid: 0.00. Start 2017-04-16 → Completion 2017-10-10. Coords None,None. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 10/10/2017. | Bayawan City Negros Oriental 3rd DEO | 2017 | 18,519,793.80 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18HK0019 | C | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM, PRIMARY ROADS: DUMAGUETE NORTH ROAD(DUMAGUETE-JCT-BAIS-KABANKALAN) INCLUDING ROW-K0045+600-K0046+148 Research notesProject ID 18HK0019. Status: Completed. Amount paid: 0.00. Start 2018-05-25 → Completion 2019-07-15. Coords 9.6015933,123.11291. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 07/15/2019. | Bais City Negros Oriental 2nd DEO | 2018 | 18,406,800.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18HL0087 | C | CONSTRUCTION OF 4 STY, 4 LAB (2 ICT, 2 SCI-LAB) @ ANTONIO B. ALEJADO MHS (MAG-ASO HS), DAUIN, NEGROS ORIENTAL Research notesProject ID 18HL0087. Status: Completed. Amount paid: 0.00. Start 2019-01-15 → Completion 2019-12-31. Coords 9.226517,123.232728. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/31/2019. | Dauin Negros Oriental 3rd DEO | 2018 | 17,718,822.82 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-19HL0099 | C | CONSTRUCTION OF 4 STY 4 LAB SCHOOL BUILDING (2 SCI-LAB, 2 ICT) @ APOLINAR B. MACIAS MEMORIAL HIGH SCHOOL, DAUIN, NEGROS ORIENTAL Research notesProject ID 19HL0099. Status: Completed. Amount paid: 0.00. Start 2019-09-20 → Completion 2020-08-03. Coords 9.21263,123.22706. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 08/03/2020. | Dauin Negros Oriental 3rd DEO | 2019 | 17,690,381.22 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HL0018 | C | BRIDGE PROGRAM: WIDENING OF PERMANENT BRIDGES : CUADRA BRIDGE (B00005NR) ALONG DUMAGUETE SOUTH ROAD, DAUIN, NEGROS ORIENTAL Research notesProject ID 20HL0018. Status: Completed. Amount paid: 0.00. Start 2020-02-17 → Completion 2021-12-12. Coords 9.1583778,123.2403428. Program: Regular Infra. | Dumaguete City Negros Oriental 3rd DEO | 2020 | 17,640,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HL0027 | C | NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING - PRIMARY ROADS : DUMAGUETE SOUTH ROAD - K0024 + 490 - K0024 + 980, ZAMBOANGUITA, NEGROS ORIENTAL Research notesProject ID 20HL0027. Status: Completed. Amount paid: 0.00. Start 2020-02-17 → Completion 2020-11-11. Coords 9.1274928,123.2136153. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 11/11/2020. | Dumaguete City Negros Oriental 3rd DEO | 2020 | 17,600,800.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18HL0101 | C | CONSTRUCTION OF 4 STY, 4 LAB (2 ICT, 2 SCI-LAB) @ PACIENTE CESAR G. CABRERA HS (NAPACAO HS), SIATON, NEGROS ORIENTAL Research notesProject ID 18HL0101. Status: Completed. Amount paid: 0.00. Start 2019-01-15 → Completion 2019-12-15. Coords 9.107,123.117. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/15/2019. | Siaton Negros Oriental 3rd DEO | 2018 | 17,595,243.05 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18HL0095 | C | CONSTRUCTION OF 4 STY, 4 LAB (2 ICT, 2 SCI-LAB) @ AURELIA G. MERECIDO MEMORIAL SCHOOL, SIATON, NEGROS ORIENTAL Research notesProject ID 18HL0095. Status: Completed. Amount paid: 0.00. Start 2019-01-15 → Completion 2019-12-09. Coords 9.0810743,123.0769924. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/09/2019. | Siaton Negros Oriental 3rd DEO | 2018 | 17,565,384.55 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-19HL0104 | C | CONSTRUCTION OF 4 STY, 4 LAB SCHOOL BUILDING (4 REG WORKSHOP, 2 ICT) @ ONG CHE TEE- BACONG HS, BACONG, NEGROS ORIENTAL Research notesProject ID 19HL0104. Status: Completed. Amount paid: 0.00. Start 2019-10-01 → Completion 2020-07-24. Coords 9.2531392,123.2945436. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 07/24/2020. | Bacong Negros Oriental 3rd DEO | 2019 | 17,559,570.67 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18HL0093 | C | CONSTRUCTION OF 4 STY, 4 LAB (2 REG WORKSHOP,1 SCI-LAB, 1 ICT) @ CAWITAN HIGH SCHOOL, SANTA CATALINA, NEGROS ORIENTAL Research notesProject ID 18HL0093. Status: Completed. Amount paid: 0.00. Start 2019-01-15 → Completion 2019-12-15. Coords 9.293,122.876. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/15/2019. | Santa Catalina Negros Oriental 3rd DEO | 2018 | 17,391,100.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18HL0102 | C | CONSTRUCTION OF 4 STY, 4 LAB (2 ICT, 2 SCI-LAB) @ SUMALIRING HS (INALAD HS) , SIATON, NEGROS ORIENTAL Research notesProject ID 18HL0102. Status: Completed. Amount paid: 0.00. Start 2019-01-15 → Completion 2020-05-29. Coords 9.0810458,123.0770066. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 05/29/2020. | Siaton Negros Oriental 3rd DEO | 2018 | 17,371,172.82 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18HL0104 | C | CONSTRUCTION OF 4 STY, 4 LAB, (4 REG WORKSHOP) @ BUNTOD HIGH SCHOOL, BACONG, NEGROS ORIENTAL Research notesProject ID 18HL0104. Status: Completed. Amount paid: 0.00. Start 2019-01-15 → Completion 2019-12-22. Coords 9.234498,123.256987. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/22/2019. | Bacong Negros Oriental 3rd DEO | 2018 | 17,321,272.82 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18HL0089 | C | CONSTRUCTION OF 4 STY, 4 LAB, (2 REG WORKSHOP, 2 SCI-LAB) @ MALOH PCHS, SIATON, NEGROS ORIENTAL Research notesProject ID 18HL0089. Status: Completed. Amount paid: 0.00. Start 2019-01-15 → Completion 2019-12-15. Coords 9.067,122.971. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/15/2019. | Siaton Negros Oriental 3rd DEO | 2018 | 17,264,780.36 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18HL0098 | C | CONSTRUCTION OF 4 STY, 4 LAB (2 ICT, 2 SCI-LAB) @ ZAMBOANGUITA SCIENCE HS , ZAMBOANGUITA, NEGROS ORIENTAL Research notesProject ID 18HL0098. Status: Completed. Amount paid: 0.00. Start 2019-01-15 → Completion 2019-12-22. Coords 9.096153,123.19936. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/22/2019. | Zamboanguita Negros Oriental 3rd DEO | 2018 | 17,221,822.82 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18HL0085 | C | CONSTRUCTION OF 4 STY, 4 LAB (2 SCI. LAB, 2 ICT) @ BAYAWAN CITY SCIENCE AND TECHNOLOGY CENTER- HIGH, CITY OF BAYAWAN (TULONG), NEGROS ORIENTAL Research notesProject ID 18HL0085. Status: Completed. Amount paid: 0.00. Start 2019-01-15 → Completion 2019-11-28. Coords 9.0810729,123.0769958. Program: Outside Infra. Sumbong sa Pangulo lists completion 03/22/2024; cost reported PHP 49,000,000.00. DPWH official transparency portal confirms accomplishment 100% as of 11/28/2019. | Bayawan City Negros Oriental 3rd DEO | 2018 | 17,221,722.82 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-23HK0035 | C | ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM:ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE -PRIMARY ROADS ALONG DUMAGUETE NORTH RD (DUMAGUETE-JCT BAIS-KABANKALAN)- K0049+938-K0050+710, BAIS CITY, NEGROS ORIENTAL Research notesProject ID 23HK0035. Status: Completed. Amount paid: 0.00. Start 2023-04-14 → Completion 2023-07-31. Coords 9.6337972,123.0980778. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 07/31/2023. | Bais City Negros Oriental 2nd DEO | 2023 | 16,907,940.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-19HJ0036 | C | CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES- JCT. DUMAGUTE NORTH ROAD-BRGY. CANDANA-AY ROAD IN SUPPORT OF MANGO GROWERS, SILICA MINING INDUSTRIES, AYUNGON, NEGROS ORIE Research notesProject ID 19HJ0036. Status: Completed. Amount paid: 0.00. Start 2019-06-19 → Completion 2019-12-22. Coords 9.8200031,123.0912544. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/22/2019. | Ayungon Negros Oriental 1st DEO | 2019 | 16,280,585.10 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-16HK0019 | C | CONSTRUCTION/REHABILITATION OF RIVER CONTROL ALONG NAGSALA RIVER BESIDE RUFINO AGUILAR NATIONAL HIGH Research notesProject ID 16HK0019. Status: Completed. Amount paid: 0.00. Start 2016-03-23 → Completion 2017-03-10. Coords 9.500833,123.109444. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 03/10/2017. | DPWH NegOr 2nd DEO area Negros Oriental 2nd DEO | 2016 | 16,124,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-25HK0061 | C | SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG DUMAGUETE NORTH ROAD (DUMAGUETE-JCT BAIS-KABANKALAN) - K0048+240 - K0049+140 Research notesProject ID 25HK0061. Status: On-Going. Amount paid: 0.00. Start 2025-03-21 → Completion None. Coords 9.6236685,123.0986184. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 79.81% as of —. | Bais City Negros Oriental 2nd DEO | 2025 | 15,362,146.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HL0095 | C | LOCAL INFRASTRUCTURE PROGRAM: REHABILITATION OF MULTI-PURPOSE BUILDING (BASAY PUBLIC MARKET) BASAY, NEGROS ORIENTAL Research notesProject ID 20HL0095. Status: Completed. Amount paid: 0.00. Start 2020-11-27 → Completion 2021-09-22. Coords 9.4151697,122.6353347. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 09/22/2021. | Basay Negros Oriental 3rd DEO | 2020 | 14,850,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-24HK0122 | C | CONCRETING OF BRGY. AZAGRA FMR, BRGY. AZAGRA, TANJAY CITY, NEGROS ORIENTAL Research notesProject ID 24HK0122. Status: On-Going. Amount paid: 0.00. Start 2024-05-29 → Completion None. Coords 9.4846111,123.14705. Program: Outside Infra. Sumbong sa Pangulo lists completion 11/26/2023; cost reported PHP 49,000,000.00. DPWH official transparency portal confirms accomplishment 45.42% as of —. | Tanjay City Negros Oriental 2nd DEO | 2024 | 14,802,467.74 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HL0049 | C | CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS: ACCESS ROAD LEADING TO THE FIL-AM-JAP AMITY MEMORIAL SHRINE, SAGBANG, VALENCIA, NEGROS ORIENTAL Research notesProject ID 20HL0049. Status: Completed. Amount paid: 0.00. Start 2020-02-17 → Completion 2020-08-08. Coords 9.2960994,123.2099075. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 08/08/2020. | Valencia Negros Oriental 3rd DEO | 2020 | 14,700,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HL0093 | C | CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS: REHABILITATION OF MULTI-PURPOSE BUILDING (BASAY PUBLIC MARKET) BASAY, NEGROS ORIENTAL Research notesProject ID 20HL0093. Status: Completed. Amount paid: 0.00. Start 2020-11-27 → Completion 2021-09-22. Coords 9.4165036,122.6338103. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 09/22/2021. | Basay Negros Oriental 3rd DEO | 2020 | 14,700,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HL0022 | C | BRIDGE PROGRAM: WIDENING OF PERMANENT BRIDGES : MAAYONG TUBIG BRIDGE (B00007NR) ALONG DUMAGUETE SOUTH ROAD, DAUIN, NEGROS ORIENTAL Research notesProject ID 20HL0022. Status: Completed. Amount paid: 0.00. Start 2020-02-17 → Completion 2021-11-29. Coords 9.1536019,123.2374378. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 11/29/2021. | Dumaguete City Negros Oriental 3rd DEO | 2020 | 14,700,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-25HL0049 | C | ORGANIZATIONAL OUTCOME 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, FATIMA LICOLICO CIS, S Research notesProject ID 25HL0049. Status: On-Going. Amount paid: 0.00. Start 2025-02-19 → Completion None. Coords 9.1764055,122.9226884. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 91.14% as of —. | DPWH NegOr 3rd DEO area Negros Oriental 3rd DEO | 2025 | 14,553,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-24HJ0130 | C | CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF CONCRETE ROAD-JCT. VALLEHERMO Research notesProject ID 24HJ0130. Status: On-Going. Amount paid: 0.00. Start 2025-03-26 → Completion None. Coords 10.3741861,123.2313556. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 11/30/2025. | DPWH NegOr 1st DEO area Negros Oriental 1st DEO | 2024 | 14,401,834.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-24HJ0129 | C | CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF CONCRETE ROAD-JCT. DUMAGUE Research notesProject ID 24HJ0129. Status: Completed. Amount paid: 0.00. Start 2025-03-26 → Completion 2025-06-19. Coords 10.2813361,123.309475. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 06/19/2025. | DPWH NegOr 1st DEO area Negros Oriental 1st DEO | 2024 | 14,401,128.35 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| DPWH-17JB0081 | C | WIDENING OF PERMANENT BRIDGES-MIAS BR. (B00426MN) ALONG DIPOLOG-SINDANGAN-LILOY ROAD. Research notesDPWH transparency portal — direct row. Project ID 17JB0081. Implementing office Zamboanga del Norte 2nd DEO. Accomplishment 100%. Completion target 01/28/2019. | Negros Oriental Zamboanga del Norte 2nd DEO | 2017 | 14,315,893.03 | A.I.YU BUILDERS & ENTERPRISES (35586) / PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | DPWH official transparency portal (transparency.dpwh.gov.ph) — direct DPWH project register | View |
| BGov-16HL0150 | C | CONST./MAINT OF BRIDGE ALONG NAT'L.RDS-RETROFITTING OF PERM. BR.- MALUAY BRIDGE ALONG DGTE. SOUTH RD Research notesProject ID 16HL0150. Status: Completed. Amount paid: 0.00. Start 2017-03-13 → Completion 2017-10-08. Coords 9.1279599,123.2141666. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 10/08/2017. | DPWH NegOr 3rd DEO area Negros Oriental 3rd DEO | 2017 | 14,240,855.22 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-017 | A | Supply of 2,212 cu.m Concrete Mix using Pumpcrete (3,000 psi) for Construction of Shoreline Protection from Pantawan 1 Going South to Pantawan 2 at Barangay Poblacion 4 Research notesOCR contractor field reads 'PHIL SOUTH BUILDERS INC' (with space) — page title spells 'Philsouth Builders'. Treat as Philsouth Builders Inc. but capture both spellings. Bid dated June 13, 2024; NOA July 1, 2024. Mayor Felipe Antonio B. Remollo signing. Bid scope is the 'continuation' of the Pantawan shoreline series. | Dumaguete City City Government of Dumaguete | 2024 | 12,719,000.00 | PHIL SOUTH BUILDERS INC | Official LGU NOA page (with attached scan, OCR'd) | View |
| BGov-21HL0124 | C | CONCRETING OF BRGY. BAGACAY FARM-TO-MARKET ROAD, BRGY. BAGACAY, DAUIN, NEGROS ORIENTAL Research notesProject ID 21HL0124. Status: Completed. Amount paid: 0.00. Start 2021-06-28 → Completion 2021-12-18. Coords 9.17705,123.23392. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/18/2021. | Dauin Negros Oriental 3rd DEO | 2021 | 12,437,500.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-23HL0087 | C | CONCRETING OF BRGY. TIMBAO FMR, BRGY. TIMBAO, BACONG, NEGROS ORIENTAL Research notesProject ID 23HL0087. Status: Completed. Amount paid: 0.00. Start 2023-08-08 → Completion 2023-12-16. Coords 9.2493514,123.2232231. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/16/2023. | Bacong Negros Oriental 3rd DEO | 2023 | 11,940,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HL0021 | C | BRIDGE PROGRAM: WIDENING OF PERMANENT BRIDGES : LAGNASAN BRIDGE (B00006NR) ALONG DUMAGUETE SOUTH ROAD, DAUIN, NEGROS ORIENTAL Research notesProject ID 20HL0021. Status: Completed. Amount paid: 0.00. Start 2020-02-17 → Completion 2021-02-15. Coords 9.1533828,123.2374958. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 02/15/2021. | Dumaguete City Negros Oriental 3rd DEO | 2020 | 11,760,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-005 | A | One (1) Lot Purchase and Installation of Solar Back-up Power Supply for use in the DRRM-CCA Satellite Response and Emergency Operations Center for 13 Health Facilities, PDRRMC, PGO, Province of Negros Oriental Research notesNOT the 25-LGU streetlight loan; 13-facility solar back-up power, smaller scope. | Negros Oriental (province-wide) Provincial Government of Negros Oriental | 2024 | 11,494,200.00 | PHILSOUTH BUILDERS INC. | Official LGU NOA page | View |
| BGov-24HK0081 | C | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, WIDENING OF PERMANENT BRIDGES, JILOCON BR. (CANTILEVERED) (B00080NR) ALONG DUMAGUETE NORTH RD (DUMAGUETE-JCT BAIS-KABANKALAN), NEGROS ORIENTAL Research notesProject ID 24HK0081. Status: Completed. Amount paid: 0.00. Start 2024-04-16 → Completion 2024-09-20. Coords 9.4243247,123.2348447. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 09/20/2024. | Bais City Negros Oriental 2nd DEO | 2024 | 11,270,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-16HL0041 | C | CONST./MAINT. OF FLOOD MITIGATION...: CONST./REHAB.OF RIVER CONTROL ALONG SIATON RIVER, BRGY. SANDUL Research notesProject ID 16HL0041. Status: Completed. Amount paid: 0.00. Start 2016-04-07 → Completion 2016-10-23. Coords None,None. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 10/23/2016. | Siaton Negros Oriental 3rd DEO | 2016 | 11,171,777.48 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-15HK0161 | C | ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING T Research notesProject ID 15HK0161. Status: Completed. Amount paid: 0.00. Start 2016-03-10 → Completion 2016-04-23. Coords 9.7887337,122.9421131. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 04/23/2016. | DPWH NegOr 2nd DEO area Negros Oriental 2nd DEO | 2016 | 10,980,535.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-003 | A | Development/Rehabilitation of Mariano F. Perdices Coliseum, Capitol Area, Negros Oriental Region VII (Central Visayas) | Negros Oriental (province-wide) Provincial Government of Negros Oriental | 2023 | 10,899,103.00 | PHILSOUTH BUILDERS INC. | Official LGU NOA page | View |
| BGov-22HL0075 | C | CONCRETING OF PROPER SAN ISIDRO TO SITIO MALUBOG FMR, BRGY. SAN ISIDRO, BAYAWAN CITY, NEGROS ORIENTAL Research notesProject ID 22HL0075. Status: Completed. Amount paid: 0.00. Start 2022-03-18 → Completion 2022-12-23. Coords 9.4168228,122.9101138. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/23/2022. | Bayawan City Negros Oriental 3rd DEO | 2022 | 9,950,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-23HL0097 | C | CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP): MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES: CONSTRUCTION OF MULTI-PURPOSE BUILDING AT STO. ROSARIO, STA. CATALINA, NEGROS ORIENTAL Research notesProject ID 23HL0097. Status: Completed. Amount paid: 0.00. Start 2023-08-29 → Completion 2024-04-24. Coords 9.3661361,122.9306028. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 04/24/2024. | Santa Catalina Negros Oriental 3rd DEO | 2023 | 9,900,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-23HL0003 | C | CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - ACCESS ROAD LEADING TO BALANAN LAKE, SIATON, NEGROS ORIENTAL Research notesProject ID 23HL0003. Status: Completed. Amount paid: 0.00. Start 2023-02-15 → Completion 2023-06-17. Coords 9.0989008,123.0097328. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 06/17/2023. | Siaton Negros Oriental 3rd DEO | 2023 | 9,800,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-24HK0050 | C | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL DIKE, BARANGAY PANALAAN, BAIS CITY Research notesProject ID 24HK0050. Status: Completed. Amount paid: 0.00. Start 2024-04-04 → Completion 2024-07-21. Coords 9.5960367,123.0503864. Program: Regular Infra. Sumbong sa Pangulo lists completion 07/21/2024; cost reported PHP 9,800,000.00. DPWH official transparency portal confirms accomplishment 100% as of 07/21/2024. | Bais City Negros Oriental 2nd DEO | 2024 | 9,800,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HL0078 | C | CONCRETING OF ROAD, APOLONG-SAGBANG-JAPANESE SHRINE, VALENCIA, NEGROS ORIENTAL Research notesProject ID 20HL0078. Status: Completed. Amount paid: 0.00. Start 2020-11-27 → Completion 2021-07-17. Coords 9.2899103,123.2146164. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 07/17/2021. | Valencia Negros Oriental 3rd DEO | 2020 | 9,800,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-23HL0041 | C | CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - CROSSING ARCO ROAD LEADING TO FOREST CONSERVATION AND REHABILITATION ECO-TOURISM SI Research notesProject ID 23HL0041. Status: Completed. Amount paid: 0.00. Start 2023-02-20 → Completion 2023-08-14. Coords 9.3569747,122.9135731. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 08/14/2023. | DPWH NegOr 3rd DEO area Negros Oriental 3rd DEO | 2023 | 9,800,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-22HL0016 | C | CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - ACCESS ROAD LEADING TO BALANAN LAKE, SIATON, NEGROS ORIENTAL Research notesProject ID 22HL0016. Status: Completed. Amount paid: 0.00. Start 2022-02-14 → Completion 2022-04-30. Coords 9.0805269,123.0159356. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 04/30/2022. | Siaton Negros Oriental 3rd DEO | 2022 | 9,800,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-19HK0034 | C | CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS @ ACCESS ROAD PANALAAN TO MARAPAO LEADING TO THE NATURAL HOT SPRING, BAIS CITY, NEGROS ORIENTAL Research notesProject ID 19HK0034. Status: Completed. Amount paid: 0.00. Start 2019-06-27 → Completion 2020-02-10. Coords 9.6103576,123.0397853. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 02/10/2020. | Bais City Negros Oriental 2nd DEO | 2019 | 9,800,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-19HL0031 | C | CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS: ACCESS ROAD LEADING TO THE FIL-AM-JAP AMITY MEMORIAL SHRINE, SAGBANG, VALENCIA, NEGROS ORIENTAL Research notesProject ID 19HL0031. Status: Completed. Amount paid: 0.00. Start 2019-06-17 → Completion 2019-11-04. Coords 9.303915,123.2393617. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 11/04/2019. | Valencia Negros Oriental 3rd DEO | 2019 | 9,800,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HL0088 | C | CONCRETING OF CALANGO BRGY ROAD, ZAMBOANGUITA, NEGROS ORIENTAL Research notesProject ID 20HL0088. Status: Completed. Amount paid: 0.00. Start 2020-11-27 → Completion 2021-06-24. Coords 9.1329778,123.1793361. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 06/24/2021. | Zamboanguita Negros Oriental 3rd DEO | 2020 | 9,800,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-008 | A | Construction of River Control - Sitio Talay, Barangay San Isidro, Tanjay City, Negros Oriental | Tanjay City Provincial Government of Negros Oriental | 2024 | 9,799,000.00 | PHILSOUTH BUILDERS, INC. | Official LGU NOA page | View |
| BGov-21HK0125 | C | CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT) AT LEZANA SUBDIVISION ROAD-FELIX CORTES ROA Research notesProject ID 21HK0125. Status: Completed. Amount paid: 0.00. Start 2021-05-05 → Completion 2022-01-06. Coords 9.3059705,123.3042148. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 01/06/2022. | DPWH NegOr 2nd DEO area Negros Oriental 2nd DEO | 2021 | 9,789,831.86 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-25HL0023 | C | CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP): ROAD FROM MANALONGON CROSSING HIGHWAY LEADING TO THE STATION OF THE CROSS IN BRGY. Research notesProject ID 25HL0023. Status: On-Going. Amount paid: 0.00. Start 2025-03-24 → Completion None. Coords 9.2322844,122.9180155. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 20.07% as of —. | DPWH NegOr 3rd DEO area Negros Oriental 3rd DEO | 2025 | 9,702,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-040 | C | Upgrading (Gravel to Concrete) - Concreting of Dumaguete-Valencia Road Leading to Casaroro Falls & Japanese Shrine Research notesDPWH project ID (no-id, eval 2014), License 21962, status Completed, CPES visit/final /87.90%. | Dumaguete City DPWH (Region VII) | 2014 | 9,626,000.00 | Philsouth Builders | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| BGov-17HL0024 | C | CONST./REPAIR/REHAB/IMPV'T. OF VAR. INFRA INCLUDING LOCAL PROJ.: ROADS LEADING BALANAN LAKE, SIATON Research notesProject ID 17HL0024. Status: Completed. Amount paid: 0.00. Start 2017-04-16 → Completion 2017-11-30. Coords None,None. Program: Regular Infra. | Siaton Negros Oriental 3rd DEO | 2017 | 9,310,031.02 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-043 | C | Construction/Repair/Rehabilitation/Improvement of Various Infrastructure Including Local Projects: Roads Leading to Balanan Lake, Siaton, Negros Oriental Research notesDPWH project ID (no-id, eval 2018), License 21962, status Completed, CPES visit/final /87.30%. | Siaton DPWH Negros Oriental 3rd DEO | 2018 | 9,310,000.00 | Philsouth Builders (Formerly: Lotiff Construction) | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| BGov-16HL0023 | C | CONSTRUCTION OF RIVER DIKE, DATAG, SIATON, NEGROS ORIENTAL Research notesProject ID 16HL0023. Status: Completed. Amount paid: 0.00. Start 2016-03-23 → Completion 2016-07-14. Coords None,None. Program: Regular Infra. | Siaton Negros Oriental 3rd DEO | 2016 | 9,309,962.02 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-20HK0067 | C | CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES INDUSTRIES AND ECONOMIC ZONES @ DUMAGUETE-BALUGO ROAD AND BAGACAY-BATINGUEL ROAD CONNECTING DUMAGUETE-VALENCIA-BACONG ROAD AND DUMAGUETE PALINPINON ROAD IN Research notesProject ID 20HK0067. Status: Completed. Amount paid: 0.00. Start 2020-02-19 → Completion 2021-03-29. Coords 9.30596,123.2939071. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 03/29/2021. | Dumaguete City Negros Oriental 2nd DEO | 2020 | 9,304,445.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-22HL0107 | C | SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, POBLACION, BASAY, NEGROS ORIENTAL Research notesProject ID 22HL0107. Status: Completed. Amount paid: 0.00. Start 2022-04-07 → Completion 2022-11-02. Coords 9.4147686,122.6354892. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 11/02/2022. | Basay Negros Oriental 3rd DEO | 2022 | 8,869,503.15 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-015 | A | Completion of Road Concreting at Dewey Island, Bais City | Bais City Provincial Government of Negros Oriental | 2026 | 8,325,000.00 | PHILSOUTH BUILDERS, INC. | Official LGU NOA page | View |
| BGov-16R00021 | C | RETROFITTING/STRENGTHENING OF BANICA BR 1 (B00089NR) ALONG DUMAGUETE SOUTH ROAD, DUMAGUETE CITY, NEGROS ORIENTAL Research notesProject ID 16R00021. Status: Completed. Amount paid: 0.00. Start 2016-03-30 → Completion 2018-08-01. Coords 9.3020079,123.3079239. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 08/01/2018. | Dumaguete City Region VII | 2016 | 6,927,026.37 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-041 | C | Concreting of Dumaguete City-Valencia-Bacong Road, Dumaguete City, K0004+532 - K0004+867.82, 2nd District, Negros Oriental Research notesDPWH project ID (no-id, eval 2015), License 21962, status Completed, CPES visit/final /90.10%. | Dumaguete City DPWH Negros Oriental 2nd DEO | 2015 | 6,832,000.00 | PHILSOUTH BUILDERS (Formerly: Lotiff Construction) | GPPB/PCAB CPES Release (DPWH performance evaluation) | View |
| BGov-20HJ0051 | C | ASSET PRESERVATION PROGRAM -PREVENTIVE MAINTENANCE TERTIARY ROADS - MABINAY-AYUNGON RD., AYUNGON, NEGROS ORIENTAL Research notesProject ID 20HJ0051. Status: Completed. Amount paid: 0.00. Start 2020-02-09 → Completion 2020-03-22. Coords 9.8242369,123.04268. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 03/22/2020. | Ayungon Negros Oriental 1st DEO | 2020 | 6,283,760.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-22HL0066 | C | BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES: CONCRETING OF ROAD, PAGATBAN, BAYAWAN CITY, NEGROS ORIENTAL Research notesProject ID 22HL0066. Status: Completed. Amount paid: 0.00. Start 2022-03-01 → Completion 2022-07-23. Coords 9.3763222,122.7409389. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 07/23/2022. | Bayawan City Negros Oriental 3rd DEO | 2022 | 5,940,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18HL0019 | C | ASSETS PRESERVATION... REHAB/RECONST/UPGRADING OF DAMAGED PAVED RDM TERTIARY RDS: DGTE CITY-VAL-BACO Research notesProject ID 18HL0019. Status: Completed. Amount paid: 0.00. Start 2018-02-08 → Completion 2018-07-03. Coords 9.260694,123.2773827. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 07/03/2018. | DPWH NegOr 3rd DEO area Negros Oriental 3rd DEO | 2018 | 5,599,720.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-22HL0017 | C | BASIC INFRASTRUCTURE PROGRAM (BIP): MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES: CONSTRUCTION OF MULTI-PURPOSE BUILDING (TRIBAL HALL), MAGLINAO, BASAY, NEGROS ORIENTAL Research notesProject ID 22HL0017. Status: Completed. Amount paid: 0.00. Start 2022-02-14 → Completion 2022-09-07. Coords 9.4718275,122.6634617. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 09/07/2022. | Basay Negros Oriental 3rd DEO | 2022 | 4,950,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-18HL0052 | C | REHABILITATION OF VALENCIA INTEGRATED WATERWORKS SYSTEMS, VALENCIA, NEGROS ORIENTAL Research notesProject ID 18HL0052. Status: Completed. Amount paid: 0.00. Start 2018-02-25 → Completion 2018-07-24. Coords 9.3063473,123.2321641. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 07/24/2018. | Valencia Negros Oriental 3rd DEO | 2018 | 4,950,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-22HL0070 | C | BASIC INFRASTRUCTURE PROGRAM (BIP): MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES: CONSTRUCTION OF MULTI-PURPOSE BUILDING (HEALTH CENTER), BARANGAY MANINIHON, BAYAWAN CITY, NEGROS ORIENTAL Research notesProject ID 22HL0070. Status: Completed. Amount paid: 0.00. Start 2022-03-18 → Completion 2022-12-02. Coords 9.3955718,122.8677584. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 12/02/2022. | Bayawan City Negros Oriental 3rd DEO | 2022 | 4,950,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-22HL0079 | C | BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONCRETING (COMPLETION) OF ROAD AT SITIO CAMBULO, BANGA, BAYAWAN CITY, NEGROS ORIENTAL Research notesProject ID 22HL0079. Status: Completed. Amount paid: 0.00. Start 2022-04-07 → Completion 2022-08-22. Coords 9.3669681,122.7858297. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 08/22/2022. | Bayawan City Negros Oriental 3rd DEO | 2022 | 4,950,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-25HK0023 | C | CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS(TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP) ACCESS ROAD LEADING TO BAHIA DE BAIS,DEWEY ISLAND,BAIS CITY,NEGROS ORIENTAL Research notesProject ID 25HK0023. Status: On-Going. Amount paid: 0.00. Start 2025-03-20 → Completion None. Coords 9.5911577,123.1426582. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 04/23/2025. | Bais City Negros Oriental 2nd DEO | 2025 | 4,895,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-16HL0162 | C | REHABILITATION OF WATERWORKS SYSTEM, PALINPINON GOING TO TIERRA ALTA (LEVEL 1 & 2), BRGY. PALINPINON Research notesProject ID 16HL0162. Status: Completed. Amount paid: 0.00. Start 2017-03-13 → Completion 2017-07-10. Coords None,None. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 07/10/2017. | DPWH NegOr 3rd DEO area Negros Oriental 3rd DEO | 2017 | 4,697,550.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-016 | A | Construction/Rehabilitation of Shoreline and Slope Protection Structures in Coastal Barangays (Banilad and Mangnao) — supply of 664 cu.m Concrete Mix using Pump Crete (3000 psi) + 62 cu.m Concrete Pre-mix (3000 psi) Research notesOCR'd document body shows item list + amount + Mayor Felipe Antonio B. Remollo signature; contractor name field not legible in OCR — name is asserted by LGU page title/URL. Manual scan review by research/editorial team recommended for verbatim contractor line confirmation. | Dumaguete City City Government of Dumaguete | 2024 | 4,143,500.00 | PHILSOUTH BUILDERS INC. | Official LGU NOA page (with attached scan, OCR'd) | View |
| BGov-18HL0003 | C | ASSETS PRESERVATION-CONST/UPGRADING/REHAB OF DRAINAGE ALONG NAT'L RD:DGTE CITY-VALENCIA-BACONG RD,K0 Research notesProject ID 18HL0003. Status: Completed. Amount paid: 0.00. Start 2018-02-08 → Completion 2018-06-23. Coords 9.2672806,123.2664118. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 06/23/2018. | Bacong Negros Oriental 3rd DEO | 2018 | 3,920,000.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-16HL0156 | C | CONST./MAINT/ OF BRIDGES ALONG NAT'L. RD. - REHAB/MAJOR REPAIR OF PERM. BRDGE: SAC-SAC BRIDGE ALONG Research notesProject ID 16HL0156. Status: Completed. Amount paid: 0.00. Start 2017-03-13 → Completion 2017-09-08. Coords 9.0703409,123.068414. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 09/08/2017. | DPWH NegOr 3rd DEO area Negros Oriental 3rd DEO | 2017 | 3,720,080.00 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-006 | A | Completion of Evacuation Center at Bugay Proper, Bayawan City, Negros Oriental | Bayawan City Provincial Government of Negros Oriental | 2024 | 2,939,300.00 | PHILSOUTH BUILDERS INC. | Official LGU NOA page | View |
| REG-009 | A | Rebidding: Additional Appropriation for the Completion of NOPH Annex Isolation Building, NOPH, Dumaguete City | Dumaguete City Provincial Government of Negros Oriental | 2024 | 2,939,300.00 | PHILSOUTH BUILDERS, INC. | Official LGU NOA page | View |
| BGov-21HL0143 | C | CONSTRUCTION/COMPLETION OF 4 STY 4 LAB (2 SCI LAB, 2 ICT) @ BAYAWAN CITY SCIENCE AND TECHNOLOGY EDUCATION CENTER - HIGH SCHOOL, CITY OF BAYAWAN (TULONG), NEGROS ORIENTAL Research notesProject ID 21HL0143. Status: Completed. Amount paid: 0.00. Start 2021-10-28 → Completion 2022-01-25. Coords 9.3865592,122.7887333. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 01/25/2022. | Bayawan City Negros Oriental 3rd DEO | 2021 | 2,763,728.08 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-17HL0008 | C | ASSETS PRESEVATION OF NATIONAL ROADS-REHAB./. . . DUMAGUETE CITY-VALENCIA-BACONG RD,K0010+659-K0010+ Research notesProject ID 17HL0008. Status: Completed. Amount paid: 0.00. Start 2017-03-27 → Completion 2017-06-10. Coords 9.2734446,123.2560132. Program: Regular Infra. DPWH official transparency portal confirms accomplishment 100% as of 06/10/2017. | Dumaguete City Negros Oriental 3rd DEO | 2017 | 2,331,279.48 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-15HK0120 | C | ASPHALT OVERLAY OF CITY STREET AT BARANGAY POBLACION 5, TANJAY CITY Research notesProject ID 15HK0120. Status: Completed. Amount paid: 0.00. Start 2016-03-16 → Completion 2016-04-05. Coords 9.5152607,123.1573974. Program: Regular Infra. | Tanjay City Negros Oriental 2nd DEO | 2016 | 1,880,969.20 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-21HL0135 | C | CONSTRUCTION/COMPLETION OF 4 STY 4 LAB (2 ICT, 2 SCI LAB ) @ AURELIA G. MERECIDO MEMORIAL HIGH SCHOOL, SIATON, NEGROS ORIENTAL Research notesProject ID 21HL0135. Status: Completed. Amount paid: 0.00. Start 2021-10-28 → Completion 2022-02-21. Coords 9.0760369,122.9416681. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 02/21/2022. | Siaton Negros Oriental 3rd DEO | 2021 | 1,753,571.43 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-21HL0133 | C | CONSTRUCTION/COMPLETION OF 4 STY 4 LAB (2 ICT, 2 SCI LAB ) @ ANTONIO B. ALEJADO MHS (MAG-ASO HS), DAUIN, NEGROS ORIENTAL Research notesProject ID 21HL0133. Status: Completed. Amount paid: 0.00. Start 2021-10-28 → Completion 2022-02-21. Coords 9.22642,123.23261. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 02/21/2022. | Dauin Negros Oriental 3rd DEO | 2021 | 1,719,187.67 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-21HL0134 | C | CONSTRUCTION/COMPLETION OF 4 STY 4 LAB (2 ICT, 2 SCI LAB ) @ PACIENTE CESAR G. CABRERA HS (NAPACAO HS), SIATON, NEGROS ORIENTAL Research notesProject ID 21HL0134. Status: Completed. Amount paid: 0.00. Start 2021-10-28 → Completion 2022-02-21. Coords 9.1071853,123.1167426. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 02/21/2022. | Siaton Negros Oriental 3rd DEO | 2021 | 1,716,179.54 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-21HL0139 | C | CONSTRUCTION/COMPLETION OF 4 STY 4 LAB (2 REG. WORKSHOP, 2 SCI LAB ) @ MALOH PCHS, SIATON, NEGROS ORIENTAL Research notesProject ID 21HL0139. Status: Completed. Amount paid: 0.00. Start 2021-10-28 → Completion 2022-02-21. Coords 9.0675186,122.9710242. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 02/21/2022. | Siaton Negros Oriental 3rd DEO | 2021 | 1,673,360.64 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| BGov-21HL0140 | C | CONSTRUCTION / COMPLETION OF 4 STY 4 LAB (4 REG. WORKSHOP) @ BUNTOD HIGH SCHOOL, BACONG, NEGROS ORIENTAL Research notesProject ID 21HL0140. Status: Completed. Amount paid: 0.00. Start 2021-10-28 → Completion 2022-02-21. Coords 9.2337417,123.2572694. Program: Outside Infra. DPWH official transparency portal confirms accomplishment 100% as of 02/21/2022. | Bacong Negros Oriental 3rd DEO | 2021 | 1,569,187.67 | PHILSOUTH BUILDERS INC (FORMERLY:PHILSOUTH BUILDERS) (21962) | BetterGov DPWH transparency dataset (DPWH project register, public mirror) | View |
| REG-001 | A | Rehabilitation of Covid-19 Testing Laboratory, NOPH, Dumaguete City, Negros Oriental | Dumaguete City Provincial Government of Negros Oriental | 2020 | 1,499,323.76 | PHILSOUTH BUILDERS | Official LGU NOA page | View |
| REG-LEAD-21HL0111 | E | 21HL0111 — Roads project, Negros Oriental (per BetterGov index) Research notesManual retrieval from DPWH portal or official record request needed. | Negros Oriental (province-wide) DPWH (Negros Oriental DEO — district to be confirmed) | — | Philsouth Builders Inc. (per indexed lead) | Search-indexed lead (DPWH PDF blocked by Imperva Incapsula in this pass; not yet authenticated) | View | |
| REG-LEAD-26RI0001 | E | 26RI0001 / 26RI0007 / 26RI0011 / 26RI0025 — Siaton 2026 BAC resolutions, Philsouth as LCB/award candidate Research notesManual retrieval from DPWH portal or official record request needed. | Siaton DPWH (Negros Oriental DEO — district to be confirmed) | — | Philsouth Builders Inc. (per indexed lead) | Search-indexed lead (DPWH PDF blocked by Imperva Incapsula in this pass; not yet authenticated) | View | |
| MJD-GC | C | Manjuyod Government Center (groundbreaking + ongoing project, Municipality of Manjuyod) Research notesOfficial Manjuyod LGU page shows project groundbreaking with Philsouth Builders Inc. (Luisito M. Tijing) named in event context. The official post confirms project EXISTENCE, project NAME, contractor PRESENCE/ROLE in the LGU's announcement. The post does NOT by itself verify Notice of Award, contract amount, loan terms, or procurement compliance unless those documents are attached or quoted in a separate official document. The PHP 200 million figure circulated in unofficial commentary is NOT verified by the official LGU post in this pass. | Manjuyod Municipality of Manjuyod (procuring entity per official LGU page) | — | Philsouth Builders Inc. (Luisito M. Tijing, per official Manjuyod LGU page event coverage) | Official LGU social media / public information source (Municipality of Manjuyod official Facebook page) | View | |
| MJD-JETTY | C | Manjuyod Jetty Port and Terminal (Municipality of Manjuyod public infrastructure) Research notesProject surfaced via the official Manjuyod LGU Facebook page in groundbreaking / launching coverage that names Philsouth Builders Inc. (Luisito M. Tijing). Confirms project existence and contractor presence in the LGU's official narrative. NOA / NTP / contract / BAC resolution not yet retrieved. | Manjuyod Municipality of Manjuyod (procuring entity per official LGU page) | — | Philsouth Builders Inc. (per official Manjuyod LGU page event coverage) | Official LGU social media / public information source (Municipality of Manjuyod official Facebook page) | View | |
| MJD-PLAZA | C | Manjuyod Plaza / Sandbar facilities (Municipality of Manjuyod public works) Research notesPlaza and Sandbar-related facilities surfaced via the official Manjuyod LGU page in launch / inspection / event coverage paired with Philsouth Builders Inc. context. Confirms project existence in the LGU's own announcement. Contract / NOA / amount not yet retrieved. | Manjuyod Municipality of Manjuyod (procuring entity per official LGU page) | — | Philsouth Builders Inc. (per official Manjuyod LGU page event coverage) | Official LGU social media / public information source (Municipality of Manjuyod official Facebook page) | View | |
| SeedE-21HL0111 | E | DPWH project 21HL0111 — Philsouth seed candidate (not yet matched in BetterGov dataset; verify directly with DPWH NOA/contract PDF) Research notesSeed contract ID 21HL0111. Manual DPWH portal retrieval needed (Incapsula bot challenge blocks programmatic fetch). | Negros Oriental DPWH (district to be confirmed) | — | Philsouth Builders Inc. (per indexed lead — verify) | Editorial seed list (master prompt §Mandatory seed rows) | View | |
| SeedE-21HK0135 | E | DPWH project 21HK0135 — Philsouth seed candidate (not yet matched in BetterGov dataset; verify directly with DPWH NOA/contract PDF) Research notesSeed contract ID 21HK0135. Manual DPWH portal retrieval needed (Incapsula bot challenge blocks programmatic fetch). | Negros Oriental DPWH (district to be confirmed) | — | Philsouth Builders Inc. (per indexed lead — verify) | Editorial seed list (master prompt §Mandatory seed rows) | View | |
| SeedE-21HK0136 | E | DPWH project 21HK0136 — Philsouth seed candidate (not yet matched in BetterGov dataset; verify directly with DPWH NOA/contract PDF) Research notesSeed contract ID 21HK0136. Manual DPWH portal retrieval needed (Incapsula bot challenge blocks programmatic fetch). | Negros Oriental DPWH (district to be confirmed) | — | Philsouth Builders Inc. (per indexed lead — verify) | Editorial seed list (master prompt §Mandatory seed rows) | View | |
| SeedE-22HK0076 | E | DPWH project 22HK0076 — Philsouth seed candidate (not yet matched in BetterGov dataset; verify directly with DPWH NOA/contract PDF) Research notesSeed contract ID 22HK0076. Manual DPWH portal retrieval needed (Incapsula bot challenge blocks programmatic fetch). | Negros Oriental DPWH (district to be confirmed) | — | Philsouth Builders Inc. (per indexed lead — verify) | Editorial seed list (master prompt §Mandatory seed rows) | View | |
| SeedE-18HK0009 | E | DPWH project 18HK0009 — Philsouth seed candidate (not yet matched in BetterGov dataset; verify directly with DPWH NOA/contract PDF) Research notesSeed contract ID 18HK0009. Manual DPWH portal retrieval needed (Incapsula bot challenge blocks programmatic fetch). | Negros Oriental DPWH (district to be confirmed) | — | Philsouth Builders Inc. (per indexed lead — verify) | Editorial seed list (master prompt §Mandatory seed rows) | View | |
| SeedE-20HK0021 | E | DPWH project 20HK0021 — Philsouth seed candidate (not yet matched in BetterGov dataset; verify directly with DPWH NOA/contract PDF) Research notesSeed contract ID 20HK0021. Manual DPWH portal retrieval needed (Incapsula bot challenge blocks programmatic fetch). | Negros Oriental DPWH (district to be confirmed) | — | Philsouth Builders Inc. (per indexed lead — verify) | Editorial seed list (master prompt §Mandatory seed rows) | View | |
| SeedE-21HK0105 | E | DPWH project 21HK0105 — Philsouth seed candidate (not yet matched in BetterGov dataset; verify directly with DPWH NOA/contract PDF) Research notesSeed contract ID 21HK0105. Manual DPWH portal retrieval needed (Incapsula bot challenge blocks programmatic fetch). | Negros Oriental DPWH (district to be confirmed) | — | Philsouth Builders Inc. (per indexed lead — verify) | Editorial seed list (master prompt §Mandatory seed rows) | View | |
| SeedE-22HK0048 | E | DPWH project 22HK0048 — Philsouth seed candidate (not yet matched in BetterGov dataset; verify directly with DPWH NOA/contract PDF) Research notesSeed contract ID 22HK0048. Manual DPWH portal retrieval needed (Incapsula bot challenge blocks programmatic fetch). | Negros Oriental DPWH (district to be confirmed) | — | Philsouth Builders Inc. (per indexed lead — verify) | Editorial seed list (master prompt §Mandatory seed rows) | View |
Manjuyod cluster (priority research)
Source class: Official LGU social media / public information source (Municipality of Manjuyod official Facebook page) — treated as official public-source evidence, classified by what each post actually proves. The official LGU post verifies project existence, project name, and the LGU's own naming of the contractor in event context. It does not by itself verify Notice of Award, contract amount, loan terms, or procurement compliance unless those documents are attached or quoted.
Manjuyod Government Center: ₱200 million figure remains UNVERIFIED. The PHP 200 million amount circulated in unofficial commentary has not been confirmed by an official LGU post, council document, AIP/APP, loan agreement, or BAC record located in this index. The Manjuyod LGU procurement file is the primary outstanding research gap.
| Item | Tier | Status |
|---|---|---|
| Manjuyod Government Center | C | Official LGU project-status confirmation. Project existence + Philsouth contractor presence confirmed via the official Manjuyod LGU page event coverage. ₱200M figure NOT confirmed by the official post; Notice of Award / contract / BAC resolution / loan record NOT located. |
| Manjuyod Jetty Port and Terminal | C | Official LGU project-status confirmation via the official Manjuyod LGU page. NOA / contract / BAC not located. |
| Manjuyod Plaza / Sandbar facilities | C | Official LGU project-status confirmation via the official Manjuyod LGU page. NOA / contract / BAC not located. |
| 23HJ0013 Manjuyod Bridge (DPWH) | E | DPWH Bridge Program candidate ID — direct PDF not retrieved (Imperva Incapsula). Manual download or FOI required. |
| 20HJ0049 Manjuyod DPWH NOA | E | Indexed lead naming "Luisito M. Tijing, Proprietor, PHILSOUTH BUILDERS"; NOA dated 2020-01-28 per snippet. Full NOA PDF NOT yet retrieved. |
| Manjuyod River flood control | C | Will appear in BetterGov DPWH and/or Sumbong feeds when contractor-filtered; verify exact contract ID. |
Company Portfolio Leads
Lead only — official procurement record not yet matched. The entries in this section appear in company portfolio pages, media reports, or public references. They are included to guide further research, but they are not treated as confirmed public awards unless matched to an official procurement record such as a Notice of Award, Notice to Proceed, contract agreement, BAC resolution, PhilGEPS award notice, or official agency posting.
| Self-claim | Claimed location / agency | Claimed amount | Source | Research notes |
|---|---|---|---|---|
| Bayawan City NORSU Sports Complex (Arena, Olympic pool, tennis, track oval) | Bayawan City LGU + Negros Oriental State University (NORSU) | ~PHP 300,000,000 (per NOCCI / FB news repost) | View | Self-asserted by Philsouth Builders Inc. on its own portfolio page. NOCCI press release confirmed launch but did not name contractor or amount. NOA / contract / PhilGEPS award not located in this pass. Need: Bayawan City BAC, NORSU procurement, and PhilGEPS Award Notice. |
| New Bais City Sports Complex (Brgy. Lapaz; Groundbreaking May 18, 2024) | Bais City LGU | NOT_PRESENT in self-claim | View | Scribd doc confirms Philsouth-as-contractor relationship to project (4-page response to a structural/geotechnical directive), but the originating LGU/agency that issued Directive No. 4 was not visible in Scribd preview. Need: Bais City BAC, original directive, NOA. |
| Tanjay City New Government Center (six-storey 'one-stop shop'; Groundbreaking Aug 9, 2023) | Tanjay City LGU | NOT_PRESENT in self-claim | View | Distinct from the Provincial New Negros Oriental Government Center (REG-004). Tanjay City LGU procurement record not located in this pass. Need: Tanjay City BAC, NOA, contract. |
| Guihulngan Mega Market (S. Villegas Street; ~7,000 sqm; ~2-yr build) | Guihulngan City LGU | PHP 194,000,000 (per philsouth.com about page self-claim) | View | Self-asserted; LGU procurement record not located in this pass. Need: Guihulngan City BAC, NOA, contract. |
| NOPH 34-room COVID-19 Isolation Facility (Negros Oriental Provincial Hospital, Dumaguete; built in 60 days) | Provincial Government of Negros Oriental | PHP 46,000,000 (per Negros Chronicle) — PHP 4-figure unverified by Tier-1 award doc | View | Distinct from REG-001 (NE-Infra-03-2020 NOPH Covid-19 Testing Lab Rehab P1.499M) and REG-009 (B-349-2024 NOPH Annex Isolation Building rebidding additional appropriation P2.939M). 46M isolation facility may correspond to an earlier Provincial NOA that was not captured in this pass. Need: Provincial BAC log for 2020 NOPH isolation facility procurement. |
| New Guihulngan City Government Center and Sports Complex, Brgy. Malusay | Guihulngan City LGU | NOT_PRESENT | View | Self-claim only. Need official Guihulngan procurement record. |
| Metro Dumaguete Diversion Roads (Dumaguete-Sibulan, Dumaguete-Bacong sections) | DPWH Negros Oriental Second District Engineering Office | NOT_PRESENT in self-claim (but partial record VERIFIED at REG-024 = 24HK0073 PHP 66.5M for ONE diversion-road segment) | View | Self-claim names two diversion segments; CPES record REG-024 covers one Diversion-Road project at PHP 66.5M. Other segment (Dumaguete-Bacong) not located in this pass. |
Source library
Every entry in the registry is backed by one of the sources below or another listed in the source ledger CSV.
| ID | Title | Type | Tier | Access date | Link |
|---|---|---|---|---|---|
| S-COA-AAR-2024 | COA Annual Audit Report on the Province of Negros Oriental for CY 2024 (mirrored on Kuryente Transparency vault) | Official audit report (COA) | A | 2026-05-05 | View |
| S-CPES-37 | GPPB/PCAB Contractors Performance Evaluation System Report — 37th Release (Jan-Jun 2024) | Official performance report (GPPB/PCAB) | A | 2026-05-05 | View |
| S-CPES-39 | GPPB/PCAB Contractors Performance Evaluation System Report — 39th Release (Jan-Jun 2025) | Official performance report (GPPB/PCAB) | A | 2026-05-05 | View |
| S-NEGOR-PORTAL | Provincial Government of Negros Oriental — Procurement Portal Index | LGU procurement portal | A | 2026-05-05 | View |
| src_000083 | DumaCity_NOA_PhilsouthBuildersInc_0020-0308-2494-2023 | html | T1 | 2026-05-05T18:41:15+08:00 | View |
| src_947437 | DumaCity_NOA_PhilsouthBuilders_0020-0089-0593-2024 | html | T1 | 2026-05-05T18:41:19+08:00 | View |
| src_916604 | DumaCity_NTP_PhilsouthBuildersInc_0020-0308-2494-2023 | html | T1 | 2026-05-05T18:41:23+08:00 | View |
| src_468298 | DumaCity_BridgeDoolSaBIR_2020-06-15 | html | T2 | 2026-05-05T18:41:28+08:00 | View |
| src_539474 | DPWH_21HK0125_NTP | T1 | 2026-05-05T18:41:32+08:00 | View | |
| src_130606 | DPWH_21HK0084_CA | T1 | 2026-05-05T18:41:33+08:00 | View | |
| src_455000 | DPWH_23HK0051_CA | T1 | 2026-05-05T18:41:36+08:00 | View | |
| src_053583 | DPWH_25HK0044_CA | T1 | 2026-05-05T18:41:37+08:00 | View | |
| src_731175 | GPPB_CPES_37th_Release_2024-07-05 | T1 | 2026-05-05T18:48:42+08:00 | View | |
| src_279574 | GPPB_CPES_39th_Release_2026-03_rev | T1 | 2026-05-05T18:48:47+08:00 | View | |
| src_749519 | COA_AAR_NegOr_CY2024_KN_mirror | T1 | 2026-05-05T18:48:52+08:00 | View | |
| src_744547 | NegOr_Procurement_Index | html | T1 | 2026-05-05T18:48:56+08:00 | View |
| src_643686 | NegOr_NOA_NE-Infra-03-2020 | html | T1 | 2026-05-05T18:52:49+08:00 | View |
| src_534871 | NegOr_NoticeNegotiated_NE-Infra-03-2020 | html | T1 | 2026-05-05T18:52:53+08:00 | View |
| src_216606 | GPPB_CPES_38th_Release_2025-01-10 | T1 | 2026-05-06T11:41:28+08:00 | View | |
| S-BetterGov-DPWH | BetterGov DPWH transparency dataset (Meilisearch index of DPWH project register) | Transparency mirror | C | 2026-05-06 | View |
| S-Sumbong | Sumbong sa Pangulo (sumbongsapangulo.ph) — flood-control project register | Government transparency portal | E | 2026-05-06 | View |
Download the Public Records Index
The files below are provided for researchers, media outlets, public-interest reviewers, and documentation teams. The CSV and JSON files contain the structured registry. The PDF and DOCX files provide a readable report version. The source ledger and research gaps file show where records came from and which items still need stronger source confirmation.
- Phase 2.1 expanded canonical:
- Phase 2 expanded public report (PDF)
- Phase 2 expanded public report (DOCX)
- Phase 2 expanded registry (CSV)
- Phase 2 expanded registry (JSON)
- Phase 2 expanded source ledger (CSV)
- Raw source files (research evidence):
- Sumbong sa Pangulo source rows (CSV)
- Sumbong sa Pangulo source rows (JSON)
- DPWH official transparency portal source rows (CSV)
- DPWH official transparency portal source rows (JSON)
- BetterGov DPWH source rows (CSV)
- BetterGov DPWH source rows (JSON)
- Retrieval queues (work-in-progress):
- DPWH PDF retrieval queue (CSV)
- LGU BAC / loan / resolution retrieval queue (CSV)
- Other formats / canonical aliases:
- Public records index report (PDF — canonical alias)
- Public records index report (DOCX)
- Public records index report (HTML, print-ready)
- Public records index report (Markdown)
- Project registry (CSV — canonical alias)
- Project registry (JSON — canonical alias)
- Source ledger (CSV — alias)
- Research gaps (CSV)
- Archive:
- Phase 1 archive — 52 records (CSV)
- Phase 1 archive — 52 records (JSON)
- Phase 2 pre-Sumbong archive — 322 records (CSV)
- Phase 2 pre-Sumbong archive — 322 records (JSON)
Update log
- Last updated: 2026-05-06
- Data version: 2.2.0-preliminary
- Records added in this version: 328
- Sources pending: 31 (see research-gaps CSV)
Submit a correction or source
If you are an LGU, agency, contractor, researcher, or member of the public and can provide official source documents for missing or incomplete entries, please contact the editorial team with the source URL or document reference. Corrections will be reviewed against public records before being added.
Editorial contact: contact@kuryentenews.com
Correction Policy
This index will be updated when new official records, source URLs, certified copies, or verified corrections become available. Entries may be reclassified when stronger sources are located. Items based only on company portfolios, media reports, or public mentions will remain marked as leads until matched to official procurement or government records.
Frequently asked questions
Is this a complete list of all Philsouth projects in Negros Oriental?
No. This is a public-source index based on records located and reviewed so far. Some records may not be available online or may require access through PhilGEPS, DPWH, LGU BAC offices, official records requests, or certified true copies.
Does this page make legal conclusions?
No. This page is a neutral public records index. It does not make legal conclusions, accuse any person or entity of wrongdoing, or determine procurement compliance.
Why are some projects marked as leads only?
Some items appear in company portfolio pages, media stories, or public references but have not yet been matched to official procurement records. These are listed as leads for further research.
Why are some DPWH records marked as needing verification?
Some DPWH source files may be blocked, archived, inaccessible through automated retrieval, or available only through manual download or official request. Those records remain marked as needing manual verification until the underlying official documents are obtained and reviewed.
Can agencies, researchers, or the public submit corrections?
Yes. Corrections and additional records may be reviewed if they include official source links, document references, certified copies, or other verifiable supporting materials.