APMT — Page 53 of 90

AGENCY ACTION PLAN and STATUS of IMPLEMENTATION RESULTS of COA VALIDATION
Agency Action Plan (for Partially Implemented
and Not Implemented Recommendations) Reason for Actual
Status of Partial/Delay/ Action Date Status of
Audit Action Plan/ Target Implementation
Ref. Audit Observations Person/ Implemen- Non- Taken/Action Follow Implemen- Remarks
Recommendations Remarks Department Implementati Implementation, Date
Responsible tation to be Taken Up tation
on Date if applicable
From To From To
454(d) of the IRR
of RA No. 7160.
2022 Unexpended balances 68. In the preparation As a commitment to DRRMO 2024 2025 Ongoing 7/16/25 Ongoing
AAR, of the Local Disaster of the LDRRMFIP, the adherence to these
AO No. Risk Reduction and the Provincial recommendations, the
14, Management Fund Disaster Risk division would like to
page (LDRRMF) Continuing Reduction and highlight the following
73 Appropriations (CA) Management actions:
totaling Council
₱8,747,114.41 from (PDRRMC) 1. Enhancing the
197 completed identify the specific division’s
projects were not PPAs for disaster administrative
reprogrammed to mitigation, capacity and
other disaster risk prevention, and capability by
reduction and preparedness in adding additional
management activities accordance with personnel and
as required under Section 5.1.2 of revisiting
Section 5.1.11 of COA COA Circular No. processes.
Circular No. 2012-002 2012-002 dated 2. Conducting
dated September 12, September 12, trainings on the
2012. Moreover, 2012, and that in procurement
₱23,574,175.90 were the preparation of process.
presented in a lump the LDRRMFIP, 3. Enhancing our
sum instead of the OIC-LDRRM office systems
specifying the projects Officer consider all management.
and activities to be aspects, such as Revisiting of the
funded, contrary to the implementation unexpended balances
Section 5.1.2 of the schedule, to determine if it is still
Circular, which may availability of implementable.
result in the delay or manpower, and
non-implementation of other resources, to
DRRM projects. complete the
projects within a
reasonable period
and to improve the
disaster
preparedness and
response
capabilities of the
Province.