  8.13 We recommended and Management agreed to:

       8.13.1 Cease the placement of funds in time deposits unless properly supported
               by a detailed computation showing excess funds beyond the
               Municipality’s normal operating and financial requirements, in
               accordance with Sections 21 and 22 of COA Circular No. 92-382; and

       8.13.2 Instruct the Municipal Treasurer to retrieve and submit complete
               supporting documents for the existing time deposit account to validate
               the legality and appropriateness of such investments.

Negotiated Procurement of CCTVs

9. Disbursements for the project Installation of Multi-Hazard Monitoring Device, with a
   contract cost of ₱3,378,422.82 and funded under the LDRRMF, procured through
   Negotiated Procurement (Two Failed Biddings), were processed despite lacking
   essential supporting documents required under the Revised IRR of RA No. 9184.
   Thus, the contractor’s technical, legal, and financial qualifications, as well as the
   Municipality’s compliance with procurement law and standards of transparency
   and fairness, could not be properly validated.

   9.1 Section 53.1 of the Revised IRR of RA No. 9184 states that, “Negotiated
       Procurement is a method of procurement of Goods, Infrastructure Projects, and
       Consulting Services, whereby the Procuring Entity directly negotiates a contract with
       a technically, legally, and financially capable supplier, contractor or consultant, in the
       case of two failed biddings.”

   9.2 Item IV.G of Annex “H” of the Revised IRR provides that, “For purposes of
       Negotiated Procurement under Section 53.1 (Two Failed Biddings), the BAC shall
       require the submission of a Certificate of PhilGEPS Registration in accordance with
       Section 8.5.2 of the IRR of R.A. 9184.” This requirement is also reiterated under Item
       V.D.1.b.iv of the Annex.

   9.3 Item IV.L.1.a of the same Annex states that, “The BAC shall recommend to the
       HOPE the award of contract. Within a period not exceeding fifteen (15) calendar days
       from receipt, the HOPE shall approve or disapprove the BAC’s recommendation.”

   9.4 Moreover, IV.L.2 thereof partly provides that, “the BAC, through its Secretariat, shall
       post the NOA, Contract/PO, including the NTP if necessary, for information
       purposes, in the PhilGEPS website, the website of the Procuring Entity concerned, if
       available, and at any conspicuous place reserved for this purpose in the premises of
       the Procuring Entity within ten (10) days from their issuance.”

   9.5 On October 16, 2024, the Municipality entered into a contract for the project titled
       Civil Works for the Installation of Multi-Hazard Monitoring Device (Closed-Circuit
       Television & Command Center) with a contract amount of ₱3,378,422.82.


                                                                                              54