Meta PixelAnnual Audit Report 2024 — City of Dumaguete — Page 65

Page 65 of 89

Page 65
                                                                            Status of
Reference          Observation             Recommendations              Implementation/
                                                                       Result of Validation
2023 AAR;    The City Government        16. Management consider        Not Implemented
AO No. 11;   has not provided a             the construction of a
Page No.     garage for motor               suitable garage for the    CEO has submitted the
67           vehicles, contrary to          safekeeping           of   proposed Program of
             the requirements of            government vehicles to     Works and Detailed
             Section V(5) of COA            protect them from the      Estimate     for    the
             Circular No. 75-6              elements and safeguard     Construction of Parking
             dated November 7,              them against damage        Facility at Barangay
             1975,           thereby        and possible theft or      Candau-ay;          for
             exposing the assets to         unauthorized               budgeting.
             rapid     deterioration,       cannibalization of parts
             destruction,        and        in accordance with       Vehicles are mostly
             possible loss.                 Section V(5) of COA      parked in Burgos Street
                                            Circular No. 75-6 dated  for close monitoring.
                                            November 7, 1975.        Some are also housed in
                                                                     Central         Materials
                                                                     Recovery Facility in
                                                                     Barangay Candau-ay.
2023 AAR;    Control           and      17. The City Treasurer’s Implemented
AO No. 12;   monitoring       over          Office (CTO) agreed to
Page No.     accountable forms was          communicate with the CTO submitted RAAF to
69           not fully observed as          depository         bank reflect return of obsolete
             the AO still had 913           regarding the steps to checks.
             bank checks that were          replace the 913 obsolete
             no longer usable and           checks they currently
             obsolete, which went           possess.
             against the PCHC
             Check Image Clearing       18. The CTO coordinate         Implemented
             System         (CICS)          with all depository
             Operating                      banks      that     hold   CTO coordinated with
             Memorandum (OM)                checking accounts for      all depository banks and
             No. 19-030. Thus,              the City, before the       will abide by the new
             continued possession           implementation of the      Check Design Standards.
             and custody of these           new Check Design
             forms only added               Standards, to ensure all
             impractical       and          bank     checks      are
             unnecessary                    successfully replaced.
             accountability to the
             concerned AO.




                                                                                                  92